Laserfiche WebLink
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />COMMERCIAL URINALS 15417 3 <br />3.03 <br />A. Coordinate piping installations and specialty arrangements with Drawings and with requirements <br />specified in piping systems. If Drawings are explicit enough, these requirements may be reduced or <br />omitted. <br />CONNECTIONS: <br />B. Connect urinals with water supplies and soil, waste, and vent piping. Use size fittings required to match <br />urinals. <br />C. Comply with water piping requirements specified in Section 15140 "Domestic Water Piping." <br />D. Comply with soil and waste piping requirements specified in Section 15150 "Sanitary Waste and Vent <br />Piping." <br />E. Where installing piping adjacent to urinals, allow space for service and maintenance. <br />3.04 <br />A. Operate and adjust urinals and controls. Replace damaged and malfunctioning urinals, fittings, and <br />controls. <br />ADJUSTING: <br />B. Adjust water pressure at flushometer valves to produce proper flow. <br />3.05 <br />A. Clean urinals and fittings with manufacturers' recommended cleaning methods and materials. <br />CLEANING AND PROTECTION: <br />B. Install protective covering for installed urinals and fittings. <br />C. Do not allow use of urinals for temporary facilities unless approved in writing by Owner. <br />END OF SECTION