SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />CONDUCTORS AND CABLES 16120 - 3 <br />G. Class 2 Control Circuits: Type THHN/THWN, in raceway. <br /> <br />3.3 <br /> <br />INSTALLATION <br />A. Install wires and cables as indicated, according to manufacturer's written instructions and <br />NECA's "Standard of Installation." <br /> <br />B. Remove existing wires from raceway before pulling in new wires and cables. <br /> <br />C. Pull Conductors: Use manufacturer-approved pulling compound or lubricant where ne- <br />cessary; compound used must not deteriorate conductor or insulation. Do not exceed <br />manufacturer's recommended maximum pulling tensions and sidewall pressure values. <br /> <br />D. Use pulling means; including fish tape, cable, rope, and basket-weave wire/cable grips <br /> that will not damage cables or raceway. <br /> <br />E. Identify wires and cables according to Division 16 Section "Basic Electrical Materials <br /> and Methods." <br /> <br />3.4 <br /> <br />CONNECTIONS <br />A. Conductor Splices: Keep to minimum. <br /> <br />B. Install splices and tapes that possess equivalent or better mechanical strength and <br /> insulation ratings than conductors being spliced. <br /> <br />C. Use splice and tap connectors compatible with conductor material. <br /> <br />D. Wiring at Outlets: Install conductor at each outlet, with at least 12 inches of slack. <br /> <br />E. Connect outlets and components to wiring and to ground as indicated and instructed by <br /> manufacturer. <br /> <br />F. Tighten electrical connectors and terminals according to manufacturer's published torque- <br /> tightening values. If manufacturer's torque values are not indicated, use those specified <br /> in UL 486A and UL 486B. <br /> <br />3.5 <br /> <br />FIELD QUALITY CONTROL <br />A. Testing: On installation of wires and cables and before electrical circuitry has been ener- <br />gized, demonstrate product capability and compliance with requirements. <br />1. Procedures: Perform each visual and mechanical inspection and electrical test stated <br />in NETA ATS, Section 7.3.1. Certify compliance with test parameters. <br /> <br />B. Correct malfunctioning conductors and cables at Project site, where possible, and retest to <br /> demonstrate compliance; otherwise, remove and replace with new units and re-test. <br /> <br />END OF SECTION 16120