My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />PANELBOARDS 16442 - 5 <br />3.3 <br />A. Install equipment grounding connections for panelboards with ground continuity to main elec- <br />trical ground bus. <br />CONNECTIONS <br />B. Tighten electrical connectors and terminals according to manufacturer's published torque- <br />tightening values. If manufacturer's torque values are not indicated, use those specified in <br />UL 486. <br />3.4 <br />A. Prepare for acceptance tests as follows: <br />FIELD QUALITY CONTROL <br />1. Test insulation resistance for each panelboard bus, component, connecting supply, feeder, <br />and control circuit. <br />2. Test continuity of each circuit. <br />B. Testing: After installing panelboards and after electrical circuitry has been energized, demon- <br />strate product capability and compliance with requirements. <br />1. Procedures: Perform each visual and mechanical inspection and electrical test indicated <br />in NETA ATS, Section 7.5 for switches and Section 7.6 for molded-case circuit breakers. <br />Certify compliance with test parameters. <br />2. Correct malfunctioning units on-site, where possible, and retest to demonstrate com- <br />pliance; otherwise, replace with new units and retest. <br />3.5 <br />A. Set field-adjustable circuit-breaker trip ranges. <br /> <br />3.6 <br />A. On completion of installation, inspect interior and exterior of panelboards. Remove paint <br />splatters and other spots. Vacuum dirt and debris; do not use compressed air to assist in <br />cleaning. Repair exposed surfaces to match original finish. <br />CLEANING <br />END OF SECTION 16442
The URL can be used to link to this page
Your browser does not support the video tag.