Laserfiche WebLink
RESOLUTION NO. 2015- 21.1 ti 3 <br /> A RESOLUTION OF THE CITY COMMISSION OF THE CITY <br /> OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE <br /> ORDERS NO. 2 AND 3 TO THE AGREEMENT WITH FLORIDA <br /> ENGINEERING AND DEVELOPMENT CORPORATION, TO <br /> PROVIDE PROFESSIONAL CONSTRUCTION SERVICES FOR <br /> THE CONSTRUCTION OF THE 174 STREET ROADWAY <br /> IMPROVEMENT PROJECT, IN AN AMOUNT NOT TO EXCEED <br /> THREE HUNDRED SIXTY-SEVEN THOUSAND TWENTY- <br /> EIGHT DOLLARS AND FIFTY-FIVE CENTS ($367,028.55), <br /> ATTACHED HERETO AS EXHIBIT "A" AND "B" <br /> RESPECTIVELY; AUTHORIZING THE CITY MANAGER TO <br /> DO. ALL THINGS NECESSARY TO EFFECTUATE THIS <br /> RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. <br /> WHEREAS, on April 16, 2015 via Resolution No. 2015-2401 the City Commission <br /> awarded Bid No. 14-11-01 to and entered into an Agreement with Florida Engineering and <br /> Development Corporation for Professional Construction Services for the construction of the <br /> 174th Street Roadway Improvements Project, in an amount not to exceed Two Million Nine <br /> Hundred Sixty-Five Thousand Seven Hundred Fifty Dollars and Twenty Cents ($2,965,750.20); <br /> and <br /> WHEREAS, the City now needs additional sidewalk and curb repair/construction done <br /> to the 174th Street corridor extending from Collins Avenue to the western terminus of the right- <br /> of-way; and <br /> WHEREAS, the City being satisfied with the professional construction services <br /> provided by Florida Engineering and Development Corporation, and who has expressed its <br /> ability and desire to provide these services, desires to amend the Agreement; and <br /> WHEREAS, the City Commission wishes to approve Change Order No. 2 to the <br /> Agreement with Florida Engineering and Development Corporation for additional Professional <br /> Construction Services for the 174th Street Roadway Improvements Project, in an amount not to <br /> exceed Two Hundred Eight Thousand Five Hundred Thirty-Seven Dollars and Fourteen Cents <br /> ($208,537.14), attached hereto as Exhibit "A"; and <br /> WHEREAS, based on a request from the City of North Miami Beach (NMB), the City <br /> has agreed to restore the water lines for the 174th Street corridor extending from Collins Avenue <br /> to the western terminus of the right-of-way; and <br /> WHEREAS, during the course of the 174th Street Roadway Improvements Project, at <br /> least two (2) of the seven (7) water service lines on 174th Street need to be replaced, with the <br /> possible need to replace the remaining water service lines once said lines are excavated and <br /> exposed in the coming phases of the 174th Street Roadway Improvements Project; and <br /> WHEREAS, NMB owns and is responsible for the water service lines in the corridor of <br /> the 174th Street Roadway Improvements Project; and <br /> R2015-Fla Engineering CO 1 and 2 to Agmt 174 St Construction Srvs Page 1 of 3 <br />