My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hypower, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
Hypower, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 4:18:25 PM
Creation date
1/7/2016 3:39:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach <br /> Construction of Underground Utility Conduit <br /> Collins & off Collins Avenue <br /> SCHEDULE OF BID PRICES <br /> PAY ITEM Quantity Unit Unit Costs Base Price <br /> PER 01020 <br /> 1 Bonds and Insurance 3 % $85,211.67 $255635.00 <br /> 2 Mobilization 1 LS $105,481.00 $105,481.00 <br /> 3 Maintenance of Traffic 15 MONTH 55,541. $105,481.00 <br /> 4 Testing, Surveying and Miscellaneous 1 LS $115,115.00 $115,115.00 <br /> 5 Indemnification Allowance 1 LS $100 $100 <br /> SUBTOTAL DIVISION 1 <br /> Install only one(1)-6 inch PVC schedule 40 <br /> 6 conduit bundled in one main trench with 5,778 LF 66.82 $386,085.96 <br /> others_for FPL Utility(FPL to furnish material) <br /> Install only two(2)-S inch PVC schedule 40 <br /> 7 conduit bundled in one main trench with 1,708 LF 66.86 $117,612.88 <br /> others for FPL Utility(FPL to furnish material) <br /> Install only three(3)-S inch PVC schedule 40 <br /> 8 conduit bundled in one main trench with 91 LF 103.88 $9,453.08 <br /> others for FPL Utility (FPL to furnish material) <br /> Install only one(1)-2 inch PVC schedule 40 <br /> 9 conduit bundled in one main trench with 691 LF 51.24 $35,406.84 <br /> _ others for FPL Utility (FPL to furnish material) <br /> Install only two(2)-2 inch PVC schedule 40 <br /> 10 conduit bundled in one main trench with 286 LF 58.54 $16,742.44 <br /> others for FPL Utility (FPL to furnish material) <br /> Install only three (3)-2 inch PVC schedule 40 <br /> 11 conduit bundled in one main trench with 5,300 LF 49.62 $262,986.00 <br /> others for FPL Utility (FPL to furnish material) <br /> Install only six(6)-2 inch PVC schedule 40 <br /> 12 conduit bundled in one main trench with 1539 LF 61.48 $94,617.72 <br /> others for FPL Utility (FPL to furnish material) <br /> Install only nine (9)-2 inch PVC schedule 40 <br /> 13 conduit bundled in one main trench with 75 LF 100.25 $7,518.75 <br /> others for FPL Utility (FPL to furnish material) <br /> Install only one(1)-S inch PVC schedule 40 <br /> 14 lateral conduit bundled in one lateral trench 913 LF 97.77 $89,264.01 <br /> with others for FPL Utility (FPL to furnish <br /> material) <br /> Install only two(2)-S inch PVC schedule 40 <br /> 15 lateral conduit bundled in one lateral trench 659 LF <br /> 105.29 $69,386.00 <br /> with others for FPL Utility(FPL to furnish <br /> material) <br /> 00300-3/26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.