My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Addendums
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 3:59:33 PM
Creation date
1/25/2016 3:59:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monday, December 28, 2015 <br /> Included in the plans are FDOT drawings titled “Signing and Pavement Markings”. There <br />are no bid items for this work. Are the quantities shown on Sheets S -3 to S-5 included in <br />this bid? <br /> <br />No, the FDOT Signing and Pavement Marking plans are included as reference only to aid in <br />the restoration of existing pavement marking and signage. <br /> <br /> Per the Measure and Payment section restoration costs are to be included in each of the <br />pipe bid items (Items 6-92). Since these are shared trenches how is this to be divided <br />among the various bid items included in the common trench? The configuration of pipes <br />change as does the restoration necessary. For instance, at some locations the lateral trench <br />will include asphalt, concrete median, curb and gutter, and concrete sidewalk where at <br />others it is only asphalt, curb and gutter and decorative sidewalk, so each lateral pipe item <br />will have to include restoring the worst case scenario. Can bid items be added for each of <br />the types of restoration required for this project? <br /> <br />No, you will need to quantify the amount of restoration needed based on the available <br />information and divide it up among the bid items as you deem appropriate. <br /> <br /> Per the Measure and Payment section the Contingency Allowance is to be used for the “off <br />Collins” work for which we do not have any plans. The work included to be covered under <br />this allowance does not include restoration only installation. How will the restoration for this <br />work be paid? <br /> <br />Section 00300 – Bid Forms has been revised. Pay item 94 “Contingency allowance…” has <br />been deleted and is no longer a part of this bid. <br /> <br /> Can the travel lane where the backbone trench is being installed remain closed during the <br />day except at intersections and driveways? <br /> <br />No, the City is adamant about opening all lanes of traffic during the day, 6:30am to 9:00pm. <br />Work is only to be performed at night. <br /> <br /> Can bid items be added to separate the FPL concrete pads? There is a big difference in <br />cost for setting a single low style transformer pad and pl acing a switch cabinet chamber? <br /> <br />Vista switch cabinets were broken out into their own pay item. Please refer to the revised <br />Bid Form in Section 00300 included in Addendum No. 4. <br /> <br /> The plans show locations where we are placing ducts to existing transformers . Are these <br />ducts to be stubbed up inside the transformer? <br /> <br />For purposes of the bid, please assume that you will stub the conduits at the surface <br />outside and adjacent to the existing transformers. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.