My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00300 - Bid Forms-F
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00300 - Bid Forms-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:54:14 PM
Creation date
1/25/2016 4:53:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />00300 - 12/26 <br />NAMED EQUIPMENT / MATERIAL SUPPLIER LIST: <br /> <br />The Contract Documents are based upon the equipment or products available from the suppliers listed <br />below. Provisions are made in the Contract Documents for alternate suppliers in certain instances whose <br />equipment or products may be deemed equivalent in quality (reference Article 6.4 of the General <br />Conditions). However, the Bidder must indicate in its Bid which named supplier the Bidder intends to use <br />(in the event an alternate is not accepted) for each item of equipment / material item listed on this form by <br />circling one of the listed Suppliers below for each type of equipment / material noted. Should a Bidder fail <br />to circle a named item in any category it hereby agrees to furnish the first supplier listed (denoted by the <br />letter A). Should a Bidder circle more than one named item in any category it hereby agrees to furnish the <br />first supplier circled. <br /> <br />In addition, where noted on the list, the Bidder must provide a price for the equipment / material item circled <br />exclusive of installation cost. The value referenced is included in the Total Base Bid Price. <br /> <br />Where "or equal" is specified in the technical specifications, the Bidder may write in the proposed "or equal" <br />Supplier name in the "OR EQUAL" SUPPLIER / MATERIAL SUPPLIER LIST, but it must nevertheless also <br />circle one of the listed Suppliers below. <br /> <br />If the proposed "or equal" Supplier is not accepted by the ENGINEER, the Bidder must furnish the circled <br />Supplier as noted above. <br /> <br />Equipment / Material Item Supplier <br /> <br />_____________________________________ <br /> <br />A. <br /> <br />B. <br /> <br />_____________________________________ <br /> <br />A. <br /> <br />B. <br /> <br />_____________________________________ <br /> <br /> <br />A. <br /> <br />B. <br /> <br />_____________________________________ <br /> <br />A. <br /> <br />B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.