Laserfiche WebLink
<br /> <br />00300 - 3/26 <br />City of Sunny Isles Beach <br /> Construction of Underground Utility Conduit <br />Collins & off Collins Avenue <br /> <br />SCHEDULE OF BID PRICES <br /> <br />PAY ITEM <br />PER 01020 Quantity Unit Unit Costs Base Price <br /> <br />1 Bonds and Insurance 3 % <br />2 Mobilization 1 LS <br />3 Maintenance of Traffic 15 MONTH <br />4 Testing, Surveying and Miscellaneous 1 LS <br />5 Indemnification Allowance 1 LS $100 $100 <br /> SUBTOTAL DIVISION 1 <br /> <br /> <br />6 <br />Install only one(1)-6 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />5,778 LF <br />7 <br />Install only two (2)-6 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />1,708 LF <br />8 <br />Install only three (3)-6 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />91 LF <br />9 <br />Install only one (1)-2 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />691 LF <br />10 <br />Install only two (2)-2 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />286 LF <br />11 <br />Install only three (3)-2 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />5,300 LF <br />12 <br />Install only six (6)-2 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />1539 LF <br />13 <br />Install only nine (9)-2 inch PVC schedule 80 <br />conduit bundled in one main trench with <br />others for FPL Utility (FPL to furnish material) <br />75 LF <br />14 <br />Install only one (1)-6 inch PVC schedule 80 <br />lateral conduit bundled in one lateral trench <br />with others for FPL Utility (FPL to furnish <br />material) <br />913 LF <br />15 <br />Install only two (2)-6 inch PVC schedule 80 <br />lateral conduit bundled in one lateral trench <br />with others for FPL Utility (FPL to furnish <br />material) <br />659 LF