<br />01020 - 4/15 <br /> <br />Item 4: <br />Testing, Surveying and Miscellaneous / LS: This item shall cover all testing including <br />but not limited to compaction test/densities, string-lining, boarding, asphalt core samples <br />and concrete core testing. This item shall also include all land surveying and layout <br />services required for the project. This item shall also include miscellaneous expenses <br />such as, but not limited to, reproduction services, As-Built Plans, meetings with the City, <br />Engineer of Record, the County, Florida Department of Transportation or other governing <br />entities, delivery services, etc. as needed to complete the project. <br />Measurement for payment shall be based on the percentage of work completed from <br />Notice to Proceed to Final Approval by the City as determined by the City. <br /> <br />Item 5: <br />Indemnification Allowance / LS: <br />The indemnification provided above shall obligate the contractor to defend at his own <br />expense or to provide for such defense, at the city option, any and all claims of liability and <br />all suits and actions of every name and description that may be brought against the City <br />excluding only those which allege that the injuries arose out of the sole negligence of the <br />city, which may result from the operations and activities under this contract whether the <br />construction operations be performed by the contractor, his subcontractor or by anyone <br />directly or indirectly employed by either. <br />Payment of the said specific consideration shall be made at the same time of the payment <br />of the first progress estimate and the contractor shall acknowledge payment of this <br />consideration by letter to the Owner after receipt of the progress payment. <br /> <br />Items 6 to 25 inclusive: <br />Install Conduit (FPL to furnish conduit) / LF: The price for these items shall include but <br />not limited to all labor, equipment and materials necessary to install and construct <br />conduits, fittings with identification tape, blown –thru pull string, end caps in accordance <br />with these contract documents which include all saw cutting, asphalt and other excavated <br />materials removal and disposal, sheeting, shoring, bracing demucking, de-watering, any <br />measures associated with dewatering such as turbidity barrier and sediment control de- <br />watering permits, abandonment, removal or relocation of existing utilities, bedding <br />material, trench backfill or additional suitable backfill material, backfill base material, <br />compacted backfill limerock base material at least 16” thick or as shown on the road <br />restoration details, compaction, material to be restored to same elevation as existing <br />asphalt pavement grading, minimum of 1-1/2” ,or as shown on the road restoration details, <br />of type SP-9.5 Asphalt Fine Mix installed per FDOT standard specification, first lift to be <br />installed upon restoration of road base material ,sod replacement, regarding of existing <br />road surfaces, mixing and regarding of existing base material, Soft digs, test pits, <br />exploratory digging and restoration for existing utilities, repairs to damaged existing <br />utilities, repairs to irrigation systems, landscape, driveway ,curb and sidewalk restoration <br />,striping and pavement markings, signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. No additional <br />compensation shall be made for changes in alignment or grade to avoid existing <br />infrastructure unless the excavation exceed ten(10) feet in depth.