<br />01020 - 6/15 <br /> <br />unsuitable material below the structure, graded stone bedding below structure, de- <br />watering, abandonment, removal or relocation of existing utilities, backfill or additional <br />suitable backfill material , and complete restoration, sod replacement, regarding of existing <br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities, <br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway <br />,curb and sidewalk restoration , signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of boxes installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items 29 : <br />Install 48”hand hole (FPL to furnish hand hole) / EA: The price for these items shall <br />include but not limited to all labor, equipment and materials necessary to install and <br />construct the structure in accordance with these contract documents which include but not <br />limited to locating, verifying and protecting existing utilities, excavation , removal and <br />disposal of unsuitable material below the structure, graded stone bedding below structure, <br />de-watering, abandonment, removal or relocation of existing utilities, backfill or additional <br />suitable backfill material , and complete restoration,sod replacement, regarding of existing <br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities, <br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway <br />,curb and sidewalk restoration , signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of structures installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br /> <br />Items 30 : <br />Install 30”hand hole (FPL to furnish hand hole) / EA: The price for these items shall <br />include but not limited to all labor, equipment and materials necessary to install and <br />construct the structure in accordance with these contract documents which include but not <br />limited to locating, verifying and protecting existing utilities, excavation , removal and <br />disposal of unsuitable material below the structure, graded stone bedding below structure, <br />de-watering, abandonment, removal or relocation of existing utilities, backfill or additional <br />suitable backfill material , and complete restoration,sod replacement, regarding of existing <br />surfaces, Soft digs, test pits, exploratory digging and restoration for existing utilities, <br />repairs to damaged existing utilities, repairs to irrigation systems, landscape, driveway <br />,curb and sidewalk restoration , signalization repair and all other consumables, <br />appurtenances and incidentals as shown on the plans and specifications and/or necessary <br />for a complete installation shall be included in the unit price for this pay item. <br /> <br />Measurement for payment shall be based upon the actual number of structures installed in <br />accordance with the contract documents. Payment shall be at the unit price bid per each. <br />