My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01300 Submittals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01300 Submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:11 PM
Creation date
1/25/2016 4:56:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01300 - 6/9 <br />proceed with fabrication or procurement of the items and with related <br />Work in accordance with City's notations and is to submit a revised <br />Submittal responsive to notations marked on the returned Submittal or <br />written in the letter of transmittal. <br />c. "RETURNED FOR REVISION": Means that deviations from the <br />requirements of the Contract Documents exist in the submittal. Contractor <br />is to resubmit revised information responsive to City's annotations on the <br />returned Submittal or written in the letter of transmittal. Fabrication or <br />procurement of items represented by the Submittal and related Work is <br />not to proceed until the Submittal is approved. <br />d. "NOT ACCEPTABLE (SUBMIT ANEW)": Signifies Equipment and <br />Material represented by the Submittal does not conform with the design <br />concept or comply with the intent of the Contract Documents and is <br />disapproved for use in the Work. Contractor is to submit Compliance <br />Submittals responsive to the Contract Documents. <br />e. "PRELIMINARY SUBMITTAL": Signifies Submittals of such preliminary <br />nature that a determination of conformance with the design concept or <br />compliance with the intent of the Contract Documents must be deferred <br />until additional information is furnished. Contractor is to submit such <br />additional information to permit layout and related activities to proceed. <br />f. "FOR REFERENCE ONLY": Signifies Submittals which are for <br />supplementary information only; pamphlets, general information sheets, <br />catalog cuts, standard sheets, bulletins and similar data, all of which are <br />useful to the City in design, operation, or maintenance, but which by their <br />nature do not constitute a basis for determining that items represented <br />thereby conform with the design concept or comply with the intent of the <br />Contract Documents. The City reviews such Submittals for general <br />content but not for substance. <br />g. "DISTRIBUTION COPY (PREVIOUSLY ACCEPTED)": Signifies <br />Submittals which have been previously accepted and are being <br />distributed to Contractor, City, Resident Project Representative, and <br />others for coordination and construction purposes. <br />F. Instruction Books / Operation & Maintenance Manuals: <br />1. Equipment instruction books and manuals shall be prepared by the <br />manufacturer and shall include the following: <br />a. Index and tabs. <br />b. Instructions for installation, start-up, operation, inspection, maintenance, <br />parts lists and recommended spare parts, and data sheets showing model <br />numbers. <br />c. Applicable drawings. <br />d. Name of contact person, phone number, and address of the nearest <br />authorized service facility. <br />e. Attached to the above shall be a notice of the exact warranty effective <br />dates, beginning and ending. <br />f. All additional data specified. <br />2. Information listed above shall be bound into hard-back binders of three-ring <br />type. Sheet size shall be 8-1/2 x 11. Binder color shall be yellow for Electrical
The URL can be used to link to this page
Your browser does not support the video tag.