Laserfiche WebLink
<br />01300 - 9/9 <br />PART 2 - PRODUCTS (Not applicable) <br />PART 3 - EXECUTION <br />3.01 SUBMITTAL LOG: Contractor shall maintain an accurate Submittal Log and a Distribution <br />List for the duration of the Work, showing current status of all Submittals and Distributees <br />at all times in a form acceptable to the City. Contractor shall make the Submittal Log <br />available to the City for its review on request, and shall bring a copy of the Submittal Log <br />to all Progress Meetings. <br />3.02 PRODUCT ON SITE: Only products, materials and equipment, that are in compliance with <br />these Specifications and the Plans AND for which the compliance documents (shop <br />drawings) have been duly approved, are allowed on site and are allowed to be used in the <br />work. <br /> <br />END OF SECTION <br />