My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01541 Protection of the Work
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01541 Protection of the Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:47 PM
Creation date
1/25/2016 4:56:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01541 - 4/4 <br />completion of Work. <br />B Control traffic to prevent damage to equipment, materials and surfaces. <br />C. Location of existing underground utilities shown on plans must be verified and <br />protected by the CONTRACTOR. Soft digs shall be used as needed to confirm <br />location. CONTRACTOR shall repair any damage to the existing utilities at <br />his/her own expense. <br /> <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION (NOT USED) <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.