My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02110 Clearing and Land Prep
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02110 Clearing and Land Prep
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:57:38 PM
Creation date
1/25/2016 4:57:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02110 - 1/3 <br />SECTION 02110 CLEARING AND LAND PREPARATION <br />PART 1 - GENERAL <br />1.01 SCOPE: <br />A. Summary of Work: The CONTRACTOR shall include the removal of trees and other <br />vegetation from areas where earthwork or other construction operations specified <br />herein are to be performed. This section also includes land preparation activities for <br />excavation and fill areas. <br />1. 02050 Demolition <br />2. 02200 Earthwork <br />3. 02221 Trenching, Backfilling and Compacting <br />1.02 APPLICABLE PUBLICATIONS: (Not Used) <br />1.03 DEFINITIONS: (Not Used) <br />1.04 SUBMITTALS: <br />A. Prior to beginning the work, CONTRACTOR shall submit a detailed plan for clearing <br />and land preparation in conformance with SECTION 01300. The plan shall detail the <br />sequence of work and describe the CONTRACTOR's planned method of clearing <br />and land preparation activities. <br />1.05 QUALIFICATIONS: (Not Used) <br />1.06 RESPONSIBILITIES: <br />A. The CONTRACTOR shall ensure the safe passage of persons around areas of <br />clearing and land preparation. The CONTRACTOR shall conduct its operations to <br />prevent injury to adjacent structures, vegetation designated to remain, other facilities <br />and persons. <br />B. Traffic: <br />1. The CONTRACTOR shall conduct its operations and the removal of cleared <br />materials to ensure minimum interference with existing access roads and other <br />adjacent occupied or used facilities. <br />2. The CONTRACTOR shall not block or otherwise obstruct access roads or <br />other occupied or used facilities without permission from the ENGINEER. <br />Where blockage is allowed, the CONTRACTOR shall provide alternate routes <br />around closed or obstructed traffic ways. <br />C. The CONTRACTOR may commence clearing or land preparation within portions of <br />the project falling within the limits of temporary construction easements or utility right- <br />of-way only with specific permission from the ENGINEER for each activity and <br />location. All requirements under A and B above apply within these limits. <br />1.07 CERTIFICATIONS AND TESTING: (Not Used) <br />1.08 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK <br />for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours <br />notice of its intention to begin new WORK activities.
The URL can be used to link to this page
Your browser does not support the video tag.