My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02200 Earthwork
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02200 Earthwork
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:57:49 PM
Creation date
1/25/2016 4:57:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02200 - 2/4 <br />1.04 SUBMITTALS: The Contractor shall submit cross-sections for record purposes for canal <br />excavations and levee embankments as described in this Section. <br />1.05 QUALIFICATIONS: (Not Used) <br />1.06 RESPONSIBILITIES: (Not Used) <br />1.07 CERTIFICATIONS AND TESTINGS: Field density tests in accordance with ASTM <br />Standards, for each type of material used in backfilling may be required. Failure to meet <br />the specified density will require the CONTRACTOR to recompact and retest, at his own <br />expense, those areas directed by the ENGINEER <br />1.08 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK <br />for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours <br />notice of its intention to begin new WORK activities. <br />1.09 WARRANTY: (Not Used) <br />PART 2 - PRODUCTS <br />2.01 MATERIALS ENCOUNTERED: <br />A. The CONTRACTOR shall consider all materials encountered in excavations, <br />excluding peat unless the quantities are less than 25 percent of the total volume, as <br />suitable for use in random fill, providing that they consist of two or more well graded <br />soils to achieve the required compaction as specified in this SECTION. <br />B. The CONTRACTOR shall use only material that is free of debris, roots, and organic <br />matter in select fill areas. Peat materials are not suitable for use in select fill. <br />1. Cohesionless materials include gravels, gravel-sand mixtures, sands, and <br />gravelly sands generally exclusive of clayey and silty material - materials which <br />are free-draining and for which impact compaction will not produce a well- <br />defined moisture-density relationship curve and for which the maximum density <br />by impact methods will generally be less than by vibratory methods. <br />2. Cohesive materials include silts and clays generally exclusive of sands and <br />gravel - materials for which impact compaction will produce a well-defined <br />moisture-density relationship curve. <br />C. The CONTRACTOR shall furnish materials for each type of fill indicated. <br />1. Select backfill: Select Backfill shall be material that is well graded, free of <br />debris, roots, organic matter and peat. Select backfill shall be material <br />excavated for the WORK (native) or may be imported. The CONTRACTOR <br />may blend native materials to achieve a material that meets the requirements <br />for Select Backfill. Select backfill shall be free from seeds of nuisance or exotic <br />species. Select Backfill shall meet the following Unified Soil Classification <br />System (ASTM D2487) designations: <br />a. Select Backfill: CL, ML, SC, SW, SP, SM <br />2. Random Backfill: Random backfill shall be material that is well graded, free of <br />debris, roots, organic matter and peat. Random backfill shall be material <br />excavated for the WORK (native) or may be imported. The CONTRACTOR <br />may blend native materials to achieve a material that meets the requirements <br />for Random Backfill. Random backfill shall be free from seeds of nuisance or <br />exotic species. Random Backfill shall meet the following Unified Soil
The URL can be used to link to this page
Your browser does not support the video tag.