My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02220 Excavation and Backfilling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02220 Excavation and Backfilling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:57:53 PM
Creation date
1/25/2016 4:57:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02220 - 1/3 <br />SECTION 02220 EXCAVATION AND BACKFILLING <br />PART 1 - GENERAL <br />1.01 SCOPE: <br />A. Summary of Work: The CONTRACTOR shall furnish all labor, materials, and <br />equipment to perform the excavation and backfilling as shown on the Drawings. <br />1. SECTION 02401 Dewatering <br />2. SECTION 02200 Earthwork <br />1.02 APPLICABLE PUBLICATIONS: <br />A. American Society of Testing Materials, (ASTM) <br />1. D-698-00a Standard Test Methods for Laboratory compaction Characteristics <br />of Soil Using the Standard Effort (56,000 ft-lbf/cu. ft.). <br />2. D-1557-00 Standard Test Methods for Laboratory compaction Characteristics <br />of Soil Using the Modified Effort (12,400 ft-lbf/cu. ft.). <br />3. D-4253-00 Standard Test Methods for Maximum Index Density and Unit Weight <br />of Soils Using a Vibratory Table. <br />4. D-4254-00 Standard Test Method for Minimum Index Density and Unit Weight <br />of Soils and Calculation of Relative Density. <br />B. Florida Department of Transportation <br />1. Standard Specifications for Road and Bridge Construction, latest edition, <br />(FDOT). <br />C. Miscellaneous Project Data: <br />1. Subsurface soil data logs <br />2. Project geotechnical report <br />1.03 DEFINITIONS: (Not Used) <br />1.04 SUBMITTALS: The CONTRACTOR shall submit, prior to the start of work, the planned <br />method of construction of the embankments shown on the Drawings, or as specified <br />herein, for the ENGINEER's review. This plan shall also indicate the intended construction <br />sequence for backfilling operation. <br />1.05 QUALIFICATIONS: (Not Used) <br />1.06 RESPONSIBILITIES: (Not Used) <br />1.07 CERTIFICATIONS AND TESTING: Field density tests in accordance with ASTM <br />Standards, for each type of material used in backfilling may be required. Failure to meet <br />the specified density will require the CONTRACTOR to recompact and retest, at its own <br />expense, those areas directed by the ENGINEER <br />1.08 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK <br />for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours <br />notice of its intention to begin new WORK activities.
The URL can be used to link to this page
Your browser does not support the video tag.