My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02232 Limerock Base
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02232 Limerock Base
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:58:00 PM
Creation date
1/25/2016 4:57:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02232 - 2/2 <br />PART 2 - PRODUCTS <br />2.01 LIMEROCK BASE: The CONTRACTOR shall provide new limerock conforming to FDOT <br />Standard Specifications for Road and Bridge Construction SECTION 911. The minimum <br />acceptable density of limerock shall be 120 lbs./cu. ft. <br />PART 3 - EXECUTION <br />3.01 BASE PREPARATION: The CONTRACTOR shall prepare the existing base by scarifying <br />and disking to a depth of not less than 6 inches for the full width of the proposed base. <br />The base shall be loosened to such an extent that no pieces larger than 3-1/2 inches in <br />the greatest dimension remain bonded together. All unsuitable base materials such as <br />organic matter, muck, roots, brush, or other material that will not compact into a suitable <br />and enduring roadbed shall be removed and disposed off-site. <br />3.02 REMOVAL OF ASPHALTIC SURFACES: The CONTRACTOR shall remove all asphaltic <br />concrete surfaces prior to scarifying of the existing rock base. All such materials shall be <br />disposed of off-site in areas provided by the CONTRACTOR, unless other disposal is <br />shown on the plans. <br />3.03 SPREADING AND SHAPING: The CONTRACTOR shall spread existing base materials to <br />the full width of the proposed new base course and to a grade and cross section roughly <br />parallel to the finished grade. Limerock shall be added as necessary to bring the <br />proposed base to the grades required on the Drawings. <br />3.04 COMPACTING AND FINISHING BASE: The CONTRACTOR shall compact by rolling with <br />either the grid-type roller or the sheep’s foot roller, properly weighted, after the spreading <br />and mixing operations are complete. The material being compacted shall be maintained <br />within plus or minus 2 percent of its optimum moisture content during compaction. Final <br />rolling shall be accomplished with traffic rollers. The base shall be compacted to not less <br />than 98 percent of the maximum density as determined by ASTM D1557-00, and in <br />accordance with FDOT Standard Specifications for Road and Bridge Construction Section <br />200. <br />3.05 PRIMING AND MAINTAINING: The CONTRACTOR shall apply prime coat only when the <br />base meets the specified density requirements and the moisture content in the top half of <br />the base does not exceed 90 percent of the optimum moisture of the base material. At the <br />time of priming, the base shall be firm, unyielding and in such condition that no undue <br />distortion will occur. The CONTRACTOR shall be responsible for assuring that the true <br />crown and template are maintained, with no rutting or other distortion, and that the base <br />meets all the requirements at the time the surface course is applied. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.