My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02577 Pavement Marking
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02577 Pavement Marking
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:58:48 PM
Creation date
1/25/2016 4:58:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />02577 - 1/3 <br />SECTION 02577 PAVEMENT MARKING <br /> <br />PART 1 - GENERAL <br />1.01 SCOPE: <br />A. Summary of Work: This Section consists of reflective pavement markers, traffic <br />stripes and makings and traffic signs as specified herein, and as required for a <br />complete installation. <br />1.02 SUBMITTALS: <br />1.03 A. Contractor shall submit shop drawings and related information for materials to be <br />used for pavement markings to the ENGINEER for approval in accordance with Section <br />01300. <br />1.04 QUALITY CONTROL: <br />A. The phrase "DOT Specifications" shall refer to the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. The DOT <br />Specifications, are referred to herein and are hereby made a part of this Contract to <br />the extent of. such references, and shall be as binding upon the Contract as though <br />reproduced herein in their entirety. <br />1.05 CERTIFICATIONS: <br />A. The CONTRACTOR shall furnish the manufacturer's certification that all signs <br />furnished conform to these specifications and shall replace or repair at his/her <br />expense all signs that fail to meet this requirement. <br />1.06 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK <br />for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours <br />notice of its intention to begin new WORK activities. <br />1.07 WARRANTY: (Not Used) <br />PART 2 - PRODUCTS <br />2.01 PAVEMENT MARKINGS <br />A. CONTRACTOR shall replace any existing reflective pavement markers damaged <br />during construction, and provide traffic stripes and markings as indicated on the <br />construction drawings and as required to comply with traffic marking standards. <br />B. Paint for traffic stripes and markings shall be in conformance with DOT specification <br />“Thermoplastic Traffic Stripes and Markings Paint" 711-12. The colors of the paint <br />shall be yellow or white as existed before the repair or as required for a complete <br />installation as described in the detail drawings and in the Manual on Uniform Traffic <br />Control Devices. <br />C. Reflective pavement markers (RPM) shall be in conformance with DOT specification <br />Section 706-2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.