Laserfiche WebLink
SECTION 16132 <br />PRECAST MANHOLES <br /> <br />PART 1 GENERAL <br />1.01 RELATED DOCUMENTS <br />A. All applicable provisions of Bidding and Contract Requirements <br />including Division 1 - General Requirements, shall govern the work <br />under this section. <br />1.02 WORK INCLUDED <br />A. Provide all labor, materials, necessary equipment and services to <br />complete the pre-cast manholes work," as indicated on the drawings, as <br />specified herein or both, except as for items specifically indicated as "NIC <br />ITEMS". <br />1.03 RELATED WORK <br />A. Section 02200 - Earthwork. <br />B. Section 15108 –Handhole and Boxes <br />1.04 SUBMITALS <br /> A. Submit shop drawings and product data in accordance with Section <br />1300. <br />1.05 DESCRIPTION <br />A. Provide precast manholes include excavating and backfilling as necessary <br />for a complete installation in accordance with drawings and specifications. <br />1.06 QUALITY ASSURANCE <br />A. The work shall be performed in accordance with the drawings. <br />Earthwork shall be in accordance with Section, EXCAVATING, <br />TRENCHING AND BACKFILLING FOR UTILITIES in Division 2. <br />1.07 COORDINATION <br />A. Prior to beginning trenching operations, exact locations and clearances <br />for all pre-cast manholes shall be established. Adjust position of <br />underground utilities or adjust runs as necessary for proper location and <br />installation.