My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 0 <br /> ® Grant and Loan Assitance <br /> ® Chen and Associates has experience with assisting our clients with obtaining grants and loans <br /> including: <br /> ® • Compliance <br /> B <br /> • CDBG Compliance <br /> ® <br /> • State Revolving Loan Loans <br /> • FIND Grants <br /> ® <br /> • FRDAP Grants <br /> ® <br /> • FEMA HMGP <br /> ® ■ FDEP 319H Grants <br /> ® The firm has researched grant applications, coordinated with the grant project manager, and has <br /> ® administered progress reports and additional accounting for our clients including the Towns of Hypoluxo <br /> and Davie. Chen and Associates administered $373,000 for the Town of Davie's 319 Grant. In addition, <br /> ® Chen and Associates helped secure $357,151 for the Hypoluxo Shores project and $686,483 for the <br /> ® Hypoluxo Point project from the Florida Department of Environmental Protection. <br /> ® CMA's Unique Qualifications for this project <br /> • The Chen Moore Team is prepared and available to expedite the project for the City of Sunny <br /> ® Isles beach upon receipt of a Notice to Proceed. Tasks already completed and information aleady <br /> ® obtained include: <br /> ® - Site visit has been conducted <br /> - Analysis of existing aerials and LIDAR data <br /> ® - Identifying, contacting and receipt of as-built/altas' for existing utility information <br /> ® - Performed preliminary GIS analysis and stormwater model <br /> ® - Coordination with our geotechnical investigation team members to obtain general subsurface <br /> conditions to conduct a preliminary evaluation of possible solutions <br /> • - Identification of additional items to be considered in the development of the proposed project <br /> ® solution including traffic calming consideration, current codes requirements regarding ADA <br /> grading,signing and striping,consideration of driveway access connections to the project area/ <br /> ® coordination with adjacent properties,etc. <br /> ® - Preliminary discussions with regulatory a enciesl <br /> concerning the possible solutions to identify both g <br /> time saving and cost saving opportunities for the r <br /> ® City in proposing a solution. w <br /> ® • The Chen Moore Team has worked together on <br /> r;-ter.:?- . :11 i:.• t <br /> numerous projects with very similar scope and budget i J- <br /> O a <br /> several municipalities successfully. =: ="' .- - ' <br /> _i, -?'Ilea_F_ <br /> ® ■ The staff and subconsultants proposed in this submittal __ yi T <br /> are the same team that has served Miami Lakes, Miamid Nan Sea <br /> Gardens, Miami Beach and Pinecrest. This team has a <br /> 0 <br /> proven track record of on-time and on-budget project <br /> ® completion. <br /> ® ■ The Team's experience in municipalities with residential components similar to the NE 174 Street <br /> Neighborhood allows the City of Sunny Isles Beach to reap the benefits of the experience and <br /> ® lessons learned in other Miami-Dade County municipalities. <br /> ® ■ CMA works with over 30 municipalities in Miami-Dade, Broward and Monroe Counties.This allows <br /> ® CMA to truly be the City of Sunny Isles Beach's consultant and advisor in regards to the design, <br /> permitting, bidding process and construction process. Experience counts. <br /> 0 <br /> 0 <br /> 401 <br /> S CH EN:MMOO RE REQ No.12-04-02 Continuing Professional Architectural&Engineering Services firms Only(CcNAI <br /> ® Category:CivilEngineering 2-2 <br /> &ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.