My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • South Pointe Phase III/IV/V- ROW Roadway and Drainage Improvement Project, Miami Beach, FL <br /> • Chen Moore and Associates is providing surveying, planning, geotechnical investigation, modeling, <br /> design, permitting, preparation of construction ,%" <br /> 0 documents, bid and award and construction : <br /> ® engineering and inspection services for __• ; _ ' < a ? E,, e4 <br /> • infrastructure improvements within the public , ..• " Tisf! t_ 1m ;t <br /> right of way areas of the South Pointe III/IV/V _ z( ' J '=w <br /> ® neighborhood of Miami Beach. The project = - ,.- a <br /> • encompasses approximately 19,000 LF of ROW <br /> infrastructure improvements including water y.5" ` <br /> ® main replacements, stormwater drainagep�.- +?r "' ll y L.r.Li. -4051 <br /> • improvements, paving and grading, streetscaping o lili° • <br /> enhancements, landscaping improvements, _. • it <br /> ® lighting improvements, and <br /> roadway <br /> reconstruction. This project also required ` <br /> • extensive coordination with the public, adjacent CRAB, historic districts and various regulatory <br /> ® agencies. <br /> • As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing <br /> ® ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The <br /> proposed stormwater design included the introduction of catch basins, and stormwater piping to <br /> • effectively collect and route the stormwater to 16 drainage gravity wells and stormwater pump station <br /> with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne <br /> Bay design and implementation of water quality treatment measures was an important consideration <br /> ® and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory <br /> • agencies during the permitting process. <br /> ® Client <br /> ® City of Miami Beach <br /> Carla Dixon <br /> ® 777 17th Street,3rd Floor <br /> • Miami Beach, FL 33139 <br /> (305) 673-7071 <br /> 0 <br /> 0 <br /> 0 <br /> • <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> • <br /> • <br /> • CHENNOORE <br /> REM.12-04-02 Continuing ProfessionoLlrchirecrural&EngineeringServicesrirmsOnly/CCNA/ <br /> • Category Civil Engineering 2-11 <br /> sncsoctihs <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.