My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Sunset Islands 1&2 ROW Infrastructure Improvements, Miami Beach, FL <br /> ® Chen Moore and Associates is the prime consultant responsible for planning, design, permitting, bid <br /> ® and award and construction engineering and inspection services for infrastructure improvements <br /> within the public right of way areas of the Sunset Islands I & II neighborhood of Miami Beach. The <br /> ® project encompasses ±11,000 LF of ROW infrastructure improvements including water main <br /> ® �, ;.s.- replacements, stormwater drainage <br /> �6�s> t$' improvements,paving&grading,traffic pavement <br /> ® s._d r�A <br /> } a-r-tCg2 marking and signing related enhancements and <br /> ® eh�:�r-'dr,�:Y�,F �,. roadway reconstruction. Extensive coordination <br /> 4t:;t with adjacent residents and with environmental <br /> -a# •e ter„ agencies was necessary due to the projects <br /> r9+, r;; environmentally sensitive location and <br /> ® 'QAr- 50k1Ct9 Y surrounding environmental resources. <br /> • : ,, ,1"` L :44 t' As part of the project stormwater and drainage <br /> a,;a4U"4sys ii ;�z: services, extensive analysis was conducted <br /> ® <br /> T' ;_; a utilizing ICPR modeling and GIS to meet and/ <br /> ® MIAMIBEACH or exceed required stormwater Level of Service <br /> Sunsetlsmlandst�82 �"'"—°' standards. The proposed stormwater design <br /> ® included the introduction of catch basins and <br /> stormwater piping to effectively collect and route the stormwater to 11 existing outfalls to Biscayne <br /> ® Bay. Due to the environmental sensitivity of Biscayne Bay design and implementation of water quality <br /> ® treatment measures was an important consideration and design factor of the system prior to outfall <br /> ® to the Bay which included utilizing exfiltration trench. Additionally, as the outfalls were existing a <br /> review and evaluation of the conditions of the outfalls was conducted and rehabilitation, upsizing and <br /> ® retrofitting the existing outfalls was a part of the final design.This project was closely coordinated with <br /> ® regulatory agencies at the outset of the project and throughout the design to ensure an expedient <br /> review and issuance of the permit. <br /> Client <br /> ® City of Miami Beach <br /> ® Maria Hernandez <br /> 1700 Convention Center Drive <br /> ® <br /> Miami Beach, FL 33139 <br /> ® <br /> (305) 673-7071 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0• <br /> CH EN:NOV RE RIO No.12-04-O2 Continuing Professional lrchitectural&Engineering Services Firms Only(CCRAI <br /> ® Category:Civil Engineering 2-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.