My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Chen Moore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 2:00:52 PM
Creation date
2/2/2016 1:41:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> ® Subconsultants'Experience <br /> ® Carty Architecture(Architecture) <br /> ® Moore Park Athletic Facility, Miami, FL <br /> ® The Moore Park Athletic Facility is a legacy gift from the Orange Bowl Committee to the City of Miami. <br /> ® Moore Park was the site of the first Orange Bowl game 75 years ago. The design includes a new synthetic <br /> turf field, running track and field event facilities, 1,500 bleachers, press box, coach boxes, restrooms, <br /> ® clubroom and concession facilities for both home and away teams, an electronic score board and <br /> ® competition field lighting. <br /> % e o v - s - _ V f} <br /> c �I nge Bo <br /> ® f <br /> _ A <br /> ® River Park Aquatic Center, Naples, FL <br /> ® The River Park Aquatic facility is due to be completed in June of 2012. The project is a replacement <br /> ® aquatic facility for the River Park neighborhood. It is located adjacent to an existing Community Center. <br /> ® The new pool consists of a six-lane lap pool, a learn-to-swim area and a zero entry portion with a large <br /> ® play feature.There are restroom and shower facilities as well as a lifeguard office, a ticket booth and a <br /> covered entry. <br /> oA <br /> ® _ ` _ <br /> �� <br /> ® - — .. I <br /> ® YMCA of South Dade, FL <br /> ® The new YMCA of South Dade is due to be complete in December 2012. Judy Carty was the Principal in <br /> ® charge of the project while she was a principal at Borrelli + Partners. She is the Architect of record for <br /> ® the project. The facility sits on a five-acre site and includes a fitness center, a two-court gymnasium, a <br /> ® splash pad,a pool with play features, multipurpose meeting rooms,a child watch center, locker rooms, <br /> family locker rooms, fitness studios, outdoor playground, outdoor basketball courts, a multipurpose <br /> ® field, and parking for 300 cars. <br /> t. <br /> ® -_ : �� *-a r;=fes . I i'I1I <br /> t may. ,-' $x 1 <br /> ® a‘i=4.-f., <br /> •- c -e' ''"'� Ft T 9 —`l oaf - <br /> i. <br /> ® M."tr-, --2.7-f-(:--11111 4006 <br /> CH EN:MOO RE RIO No.12-04-O2 Continuing Professional Architectural&Engineering Services firms Only(CCM• Category:Civil Engineering 2-15 <br /> raisocuhs <br />
The URL can be used to link to this page
Your browser does not support the video tag.