My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACAI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
ACAI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 11:54:24 AM
Creation date
2/4/2016 11:52:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DANIA BEACH MARINA <br /> s, DANIA BEACH, FLORIDA <br /> co _ <br /> I <br /> D) EXISTING CONDITION <br /> 0_ — . _ <br /> ��fi{j'I1�'y <br /> I I , r ' I..• t l ,.-.= • <br /> I -lam i1110 <br /> .g1 ��1 �a�ll► <br /> PROPOSED DESIGN <br /> CLIENT: <br /> Mr. Colin Donnelly Providing professional services to rehabilitate <br /> Assistant City Manager and redesign the existing Dania Beach Marina. <br /> 100 W. Dania Beach Boulevard The scope of services include a feasibility <br /> Dania Beach, FL 33004 study, marketing and dockage rate analysis, <br /> Phone: (954) 924-6800 planning, programming, cost estimates, <br /> Fax No. (954) 921-2604 dredging analysis, boundary survey, <br /> Email: cdonnelly@ci.dania-beach.fl.us specifications and construction drawings. The <br /> construction drawings include the following: <br /> ANTICIPATED DESIGN COMPLETION new seawall plans, marina construction plans, <br /> DATE: 2011 hardscape improvement plans, landscape <br /> improvements, security improvements, dock <br /> ANTICIPATED CONSTRUCTION master renovation and a building that includes <br /> COMPLETION DATE: 2013 laundry, locker, and restroom facilities. The <br /> COST OF CONSTRUCTION: marina will have a completely new layout to <br /> Estimated at $4,500,000.00 maximize space and revenue along with a new <br /> fire protection system with new electrical, and <br /> sewer pump out facilities. <br /> City of Sunny Isles Beach Request for Proposal No. 12-04-02 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.