Laserfiche WebLink
CITY OF OAKLAND PARK <br /> >1 MUNICIPAL BUILDING <br /> r�P^� rrn <br /> K <br /> v/ n,o _ • {{{{{{77] ,y i I OAKIA-Nps e <br /> 0 2 � '� ? r_' uuuicive� euiimea <br /> U) 111) `I}��l _ _— ���- s <br /> I <br /> i4 1 1139 e <br /> 0._ ...1.0:-4. "ilk -1. - di. L-7. L _ <br /> — v <br /> OWNER/ CLIENT: Craven Thompson & Associates along <br /> Mr. Harris Hamid, P.E., Director with Zelch Architects provided the City <br /> Engineering & Community Development of Oakland Park with a facility study in <br /> City of Oakland Park order to consolidate several City <br /> 5399 N. Dixie Highway departments into one building. The <br /> Oakland Park, Florida 33334 Project consisted of a Needs Study <br /> Phone: (954) 630-4477 and design drawings for the <br /> Email: harrish@oaklandpark.org renovation of an existing building to <br /> START DATE: September 2006 accommodate several different City <br /> departments. The consolidation of <br /> COMPLETION DATE: March 2009 these departments allowed the City to <br /> CTA FEES: utilize the existing space to serve <br /> Contract Amount: $224,920.00 other City departments and expand <br /> Billed Amount: $206,807.00 several community programs. <br /> COST OF CONSTRUCTION: $3,000,000.00 <br /> The renovations also included space <br /> '; for the Broward County Sheriff's <br /> Office. The renovated facility will <br /> ' - support Code Enforcement, <br /> i1--1 t -_:_ <br /> Engineering, Fire Prevention, Building <br /> .> .1‘1::—' L - <br /> ' „y1 Department, Permitting & Licensing <br /> — - and Planning & Zoning. <br /> 3 1 <br /> City of Sunny Isles Beach I Request for Proposal No. 12-04-02 24 <br /> mi <br />