Laserfiche WebLink
0 <br /> ® Local County Gov't Project- Cultural Center Yeti <br /> 0 <br /> ® HISTORIC HAMPTON HOUSE RESTORATION AND ADAPTIVE REUSE <br /> ® r:hicmi. FL <br /> Guava!Unite PA <br /> 0 <br /> ® <br /> .cope of Work for Phase I: Client <br /> 0 he building was abandoned for over 20 years and was designated an Unsafe Ms.Maria Rodriguez-Porto or <br /> Structure by the local Miami Dade County Building Department. The roof and floors MMariodemos <br /> ® Miamiad County <br /> had completed collapsed. The scope of work involved the selective demolition, Rovsingg Dand Community <br /> 0 general clear-up asbestos removal/abatement, and the structural stabilization of Development <br /> the building. Structural stabilization included new footings and new steel bracing at 701 NW 151Court, 14th Floor <br /> ® <br /> all exterior and interior masonry walls. Temporary protection was provided for the Miami,FL 33136 <br /> ® historic artifacts including original murals, tile work, etc. Tel. 786-469-2112 <br /> 0 Scope of Work for Phase II: mberr@miamidade.gov <br /> ® The scope of work involves the adaptive reuse of an existing historic building. Full <br /> A/E services were provided including the preparation of a Financial Feasibility Project Size:30,000 SF <br /> ® Study, Preparation of a Waiver of Plat„ Upgrades to all utilities, Obtaining Zoning Phase I <br /> ® Variances for parking, public works, lot coverage and landscape; Presentations to Total Design Fees, $40,000.00 <br /> Community Councils and to the Board of county Commissioners; Preparation of a Construction Cost. (Budget) <br /> ® new Adaptive Reuse Design to convert the building from a 50-room motel into a $800,000.00 <br /> ® cultural center. Programmatic spaces included restored historic rooms, café and Construction Cost (Actual) <br /> lobby, new multi-purpose room with kitchen, museum and exhibit space, classroom $650,000.00 <br /> ® spaces for music education, and some retail space. The change of use from motel <br /> to business occupancy and the general state of disrepair, prompted that the entire Phase I was completed 2 <br /> months ahead of schedule and <br /> building be brought up to current code. Therefore, Life Safety design included new was under the budget <br /> 0 means of egress to support the additional occupant load, new stairs, modifications <br /> to existing stairs, and a new sprinkler system and fire alarm system. The building was Phase II <br /> 0 also made ADA compliant with new elevators, and barrier removals for level Total Design Fees; $731,400.00 <br /> ® changes, all while maintaining the historic characteristics of the original building Construction Cost (Budget) <br /> design. $7,000,000.00 <br /> ® Construction Cost: (Actual) <br /> • _ _ . I $4,750,000.00 <br /> ® 1 _ r 1� —= ; Construction Completion: 2013 <br /> IMEMeiliits-�+� 1 t <br /> ,. Consultant Gurri Matute PA <br /> ® - tt _ =. TT - 7t,;, <br /> 8(` •'` Role of the Firm:Prime, <br /> L_._ le- _c -4 ,-. ra $c.,.. ^ ''i - T Architect of Record, <br /> ® ate. .1,f04., "1 �] `. _ 'yi,s 9'tir '�+� Project Management <br /> ? t = :�• X31 _ <br /> ® " !' Key Persons: <br /> ® _ - Jose G.Matute,AIA, LEED AP, <br /> 4,, CGC, <br /> ® rhosograph Coca 1960 Daphne I.Gurri,AIA, LEED AP, <br /> - -- ---- - - - - Fabio Segre <br /> 9 'tAlex Harden <br /> o — <br /> -y, j+ !dr- <br /> _ <br /> LEED:Not Applicable <br /> ( r -- - .. I ' it" -.1-1 Ler . <br /> 4j <br /> 0 <br /> ® Adaptive Reuse Design GURRI MATUTE <br /> ® Permitting Submittals: State of Florida Historic Preservation Office (SHPO), Miami <br /> Dade County Building Department, Miami Dade County (PERA), WASD. - <br /> ® Gurri Matute PA/RFQ Na. 12-04-02/Page 14 <br />