Laserfiche WebLink
® Pr Ell <br /> fl Kimley-Horn and Associates,Inc. Cityof Sunny Isles Beach,May 1,2012 <br /> 0 <br /> • Roadway Planning and Design. Roadway design and planning are mainstays of Kimley-Horn's professional <br /> o practice. Collectively, our engineers have been responsible for the design of more than 2,000 miles of <br /> roadway, much of it here in Florida. We have provided these services for urban, rural, primary, secondary, and <br /> • interstate roadways for clients ranging from local municipalities to state departments of transportation. We <br /> • are well equipped to address all related aspects of roadway design projects such as intersection geometrics, <br /> • utility relocations, traffic control, signalization, and other features. Paving and drainage services are an integral <br /> part of our roadway design projects, and our substantial experience in dealing with regulatory and other <br /> ® agencies enables us to secure the necessary permits and approvals for building and upgrading roadway <br /> ® facilities. In addition, Kimley-Horn has provided construction administration services on hundreds of miles of <br /> ® urban and rural roadways for projects ranging from limited-access arterials, to collector facilities for counties, <br /> cities, and state departments of transportation. Construction phase services include cost estimating, pre-bid <br /> ® services, and construction administration/observation. <br /> B Stormwater Engineering and Drainage Design. Kimley- ^M QQQ •-- <br /> Horn has helped solve some of the country's most —. f ��" <br /> • complex stormwater runoff, retention, and treatment � t � •' 1 O e^ <br /> issues. We can handle all of your permitting, design, 1 1 go -' <br /> ® and construction needs, from start to finish. Our Services '' ') <br /> • include: ` } � �` -'� <br /> ■0 Stormwater master plans • 7, _I - `^ ,z -t''. <br /> ® ■ Hydrological and hydraulic analysis I. P. #_–\ <br /> ® ■ Drainage system retrofitting d. r --'-',1--.-.-• \ ----.. <br /> ® • NPDES monitoring and compliance programs ,_ = <br /> ® • Financing sources, including stormwater utility fee . - ' , <br /> - <br /> planning <br /> ■ Surface water quality monitoring <br /> ® ■ Erosion and sediment control plans <br /> ® ■ Water control structure and pump station design <br /> ® <br /> Our past experience with the City of Miami, towns of Miami Lakes, Cutler Bay, and Bay Harbor Islands, the <br /> Village of Palmetto Bay, and South Florida Water Management District (SFWMD), to name a few clients, has <br /> ® given us a keen insight into the many complicated stormwater challenges facing South Florida. We have <br /> • demonstrated our ability to develop common sense solutions for stormwater and drainage issues for roadway <br /> construction, as well as an ability to secure permits from SFWMD, Florida Department of Transportation, EPA, <br /> • DEP PERA, and the Florida Fish and Wildlife Conservation Commission. <br /> • <br /> ® Water/Wastewater Facilities. The firm's water and wastewater capabilities encompass all planning, design, <br /> permitting, and construction phase services required from the onset of a project through the approval process <br /> ® to completion of the project. Our staff of professionals has extensive experience in the design of new <br /> • systems and the rehabilitation of existing systems, including gravity systems, master pumping stations, <br /> ® force mains, lift stations, water mains, and water storage facilities. An important factor in modifying water and <br /> wastewater systems is often maintaining operation of the existing facilities while bringing the new facilities <br /> • on line. Kimley-Horn has extensive experience in successfully and efficiently making these smooth <br /> ® transitions. Examples include minimizing downtime for the rehabilitation of the master wastewater pumps <br /> stations for the Town of Bay Harbor Islands and the City of North Bay Village. In both cases, station operation <br /> was maintained while each pump was rehabilitated individually and the new control system was constructed. <br /> • Switch over to the new equipment occurred quickly and efficiently with no impacts to the community. <br /> 0 <br /> RFC No.12-64-02 Kimley-Horn <br /> • OY2OCEIS.12o Sunny Isles Civil_Environmental Eng.intltl lb.-=r 1 and Associates,Inc. <br /> • 2 <br />