Laserfiche WebLink
RESOLUTION NO. 2016- 2.52y <br /> A RESOLUTION OF THE CITY COMMISSION OF THE CITY <br /> OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE <br /> ORDER NO. 6 TO THE AGREEMENT WITH FLORIDA <br /> ENGINEERING AND DEVELOPMENT CORPORATION, TO <br /> PROVIDE PROFESSIONAL CONSTRUCTION SERVICES FOR <br /> THE CONSTRUCTION OF THE 174 STREET ROADWAY <br /> IMPROVEMENT PROJECT, IN AN AMOUNT NOT TO EXCEED <br /> TWO HUNDRED FORTY-SIX THOUSAND EIGHT HUNDRED <br /> THREE DOLLARS AND FIFTY-THREE CENTS ($246,803.53), <br /> ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE <br /> CITY MANAGER TO DO ALL THINGS NECESSARY TO <br /> EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN <br /> EFFECTIVE DATE. <br /> WHEREAS, on April 16, 2015 via Resolution No. 2015-2401 the City Commission <br /> awarded Bid No. 14-11-01 to and entered into an Agreement with Florida Engineering and <br /> Development Corporation for Professional Construction Services for the construction of the <br /> 174th Street Roadway Improvements Project, in an amount not to exceed Two Million Nine <br /> Hundred Sixty-Five Thousand Seven Hundred Fifty Dollars and Twenty Cents ($2,965,750.20); <br /> and <br /> WHEREAS, on October 15, 2015 via Resolution No. 2015-2473 the City Commission <br /> approved Change Order No. 2 to the Agreement with Florida Engineering and Development <br /> Corporation, in an amount not to exceed Two Hundred Eight Thousand Five Hundred Thirty- <br /> Seven Dollars and Fourteen Cents ($208,537.14), and Change Order No. 3 for additional <br /> Professional Construction Services for the 174th Street Roadway Improvements Project, in an <br /> amount not to exceed One Hundred Fifty-Eight Thousand Four Hundred Ninety-One Dollars and <br /> Forty-One Cents ($158,491.41), for a total amount not to exceed Three Hundred Sixty-Seven <br /> Thousand Twenty-Eight Dollars and Fifty-Five Cents ($367,028.55), bringing the total contract <br /> not to exceed amount to Three Million Three Hundred Thirty-Two Thousand Seven Hundred <br /> Seventy-Eight Dollars and Seventy-Five Cents ($3,332,778.75); and <br /> WHEREAS, the original design and scope contemplated the construction of five-foot <br /> sidewalks and the addition of bicycle lanes using the existing one-foot grass strip which is <br /> currently embedded in the sidewalk, although the bike lane striping was eliminated via Change <br /> Order No. 4, the overall pavement width was maintained in order to retain the flexibility to add <br /> the bike lanes in the future, and Change Order No. 5 for temporary lighting due to FPL meter <br /> outage; and <br /> WHEREAS, it has now been deemed more favorable for the City and its residents to <br /> forgo the concepts of bike lanes all together, in lieu of wider seven-foot sidewalks through the <br /> entire corridor; and - <br /> WHEREAS, the City now needs additional sidewalk and curb repair/construction done <br /> to the 174th Street corridor to construct this expanded scope along the full length of 174th Street <br /> corridor within the Phase I limits which was previously completed; and <br /> R2016-Ha Engineering CO6 to Agmt 174 St Construction SrvsPage 1 of 3 <br />