Laserfiche WebLink
1.1.6. Bid Specifications <br /> 1.1.7. General Conditions <br /> 1.1.8. Supplementary General Conditions <br /> 1.1.9. Terms and Conditions <br /> 1.1.10. This Agreement <br /> 1.1.11. Certificates of Insurance <br /> 1.1.12. Performance and Payment Bonds <br /> 1.1.13. Technical Specifications <br /> 1.1.14. Drawings and Plans <br /> 1.1.15. Addenda <br /> 1.1.16. Written directives and interpretations <br /> 1.1.17. Manufacturers warranties <br /> Collectively the above documents, including this Agreement, are referred to as the "Contract <br /> Documents", and are incorporated herein by reference and made a part hereof. <br /> ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION, LIQUIDATED <br /> DAMAGES AND EARLY COMPLETION BONUS <br /> 2.1 Time is of the essence in the performance of the Work under this Agreement. The <br /> Commencement Date shall be the date specified in the Notice to Proceed issued by the City <br /> Manager or his designee. Contractor shall perform the Work in accordance with the Contract <br /> Documents and shall achieve Final Completion of the Work no later than March 31, 2017, with <br /> Substantial Completion required no later than March 1, 2017. <br /> "Substantial Completion" is defined herein as the stage in which the Work or designated portion <br /> thereof is sufficiently complete in accordance with the Contract Documents so that the City can <br /> occupy or utilize the Work for its intended use. The Substantial Completion shall be no later than <br /> March 1, 2017. <br /> "Final Completion" means the date certified by the Engineer of Record for the Project that all <br /> documents required by the Contract Documents have been received by the Engineer of Record; <br /> any other documents required to be provided by Contractor have been received by the Engineer <br /> of Record; and to the best of Engineer of Record's knowledge, information and belief the Work <br /> defined herein have been fully completed in accordance with the terms and conditions of the <br /> Contract Documents. The Final Completion date shall be March 31, 2017. <br /> 2.2 Contractor shall complete all applications for the Permits, and submit all required <br /> documents, including but not limited to the Bonds and the Insurance Certificate, within ten (10) <br /> calendar days after issuance of a Notice to Proceed by the City. In the event Contractor fails to <br /> deliver to the City the required documents within ten (10) days after issuance of a Notice to <br /> Proceed, or fails to apply for the Permits within ten (10) days after issuance of a Notice to <br /> Proceed, or fails to commence Work by the date specified in the Notice to Proceed issued by the <br /> City Manager or his designee, then Contractor shall be in default. In such event the City, in <br /> addition to all remedies provided for an event of Contractor's default hereunder, shall have the <br /> right to collect from Contractor all expenses incurred by the City in the re-procurement of the <br /> Work. <br /> S8 B <br />