Laserfiche WebLink
PHASE 2 <br />VARADERO SITE LOGISTICS PLAN <br />PHASE 2 <br />10/02/15 <br />TOWER <br />CRANE <br />(115 FT RADIUS) <br />TOWER <br />CRANE <br />(85 FT RADIUS) <br />TEMP WELLS & <br />DEWATERING TANKS <br />CONSTRUCTION <br />TRAILERS <br />BUCKHOIST <br />DUMPSTERS <br />CONCRETE WASHOUTS <br />SITE ROAD <br />DUMPSTER <br />TEMP POWER TRANSFORMER <br />(SAME LOCATION AS PHASE 1) <br />PROTECTIVE <br />WALKWAY <br />TIRE SCRUBBERS <br />SITE EXIT <br />(30 FT) <br />SITE ENTRANCE <br />(30 FT) <br />CONSTRUCTION FENCE <br />(PLYWOOD) <br />TOILETS BUCKHOIST <br />TOILET <br />(refer to schedule for start/finish and durations)