My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2474
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 4:09:57 PM
Creation date
5/4/2016 4:09:52 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2474
Date (mm/dd/yyyy)
10/15/2015
Description
Reso/Interlocal Agmt w/NMB re: 174 St. Roadway Imp. Water Lines.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ypMMT fit(I <br /> • <br /> • <br /> ,4•'t 0/ <br /> INTERLOCAL AGREEMENT BETWEEN THE CITY OF SUNNY <br /> ISLES BEACH AND THE CITY OF NORTH MIAMI BEACH FOR CONCRETE <br /> ASBESTOS PIPE REPLACEMENT AT THE 174TH STREET ROADWAY <br /> IMPROVEMENTS PROJECT <br /> THIS INTERLOCAL AGREEMENT is made and entered into this day of <br /> , 2016, between the City of Sunny Isles Beach, Florida (the "City") and the City <br /> of North Miami Beach, Florida (hereinafter "NMB"), collectively referred to as the "Parties." <br /> WITNESSETH: <br /> WHEREAS, the Parties herein wish to facilitate the replacement and installation of <br /> concrete asbestos pipes in connection with the City of Sunny Isles Beach's 174th Street Roadway <br /> Improvement Project (hereinafter referred to as the "Services"); and <br /> WHEREAS, the City of Sunny Isles Beach (hereinafter referred to as "City") is currently <br /> engaged in the 174th Street Roadway Improvements Project consisting of a roadway <br /> enhancement spanning the right-of-way of 174th Street from Collins Avenue to the street's <br /> western terminus past North Bay Road; and <br /> WHEREAS, during the course of the 174`h Street Roadway Improvements Project, at <br /> least three (3) of the seven concrete asbestos pipes on 174th Street need to be replaced, and the <br /> City has agreed to replace the pipes for NMB; and <br /> WHEREAS, the City of North Miami Beach (hereinafter referred to as "NMB") owns <br /> and is responsible for the concrete asbestos pipes in the corridor of the 174th Street Roadway <br /> Improvements Project; and <br /> WHEREAS, NMB has agreed to reimburse SIB's costs, on a per concrete asbestos pipe <br /> replacement basis, up to a maximum of seven (7) concrete asbestos pipes with a combined total <br /> not to exceed (`NTE") amount of One Hundred Eighteen Thousand Eight Hundred Sixty <br /> Eight Dollars and Fifty Six Cents ($118,868.56). <br /> • <br /> NOW THEREFORE, in consideration of the mutual representations, terms <br /> and covenants hereinafter set forth, the parties hereby agree as follows: <br /> Section 1. Incorporation of Recitals <br /> The above recitals are true and correct and are hereby incorporated herein. <br /> Section 2. Price and Payment Deadline <br /> NMB agrees to reimburse the City for Seventy Five Percent (75%) of the estimated costs <br /> totaling One Hundred Fifty Eight Thousand Four Hundred Ninety One Dollars and Forty <br /> One Cents ($158,491.41) to replace a maximum of seven (7) concrete asbestos pipes for the <br /> Pagel SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.