My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2474
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 4:09:57 PM
Creation date
5/4/2016 4:09:52 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2474
Date (mm/dd/yyyy)
10/15/2015
Description
Reso/Interlocal Agmt w/NMB re: 174 St. Roadway Imp. Water Lines.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 10/92015 Item Coversheet <br /> Cityof Isles Beach <br /> Of���'.':�''1 Bf Sunny <br /> .-2(- 1;, 18070 Collins Avenue <br /> \ --, 1= Sunny Isles Beach,Florida 33160 <br /> •::°, f a��d/� (305)967-0606 City Hall <br /> °•: ° (305)949-3113 Fax <br /> oi sum <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Elka Linton-Dorsett, Capital Projects Manager <br /> DATE: 10/15/2015 <br /> Resolution Approving an Interlocal Agreement between <br /> the City of Sunny Isles Beach and the City of North <br /> RE: Miami Beach for the replacement of existing water <br /> service lines within the limits of the 174th Street <br /> Roadway Improvement project <br /> RECOMMENDATION: <br /> Staff recommends approval of this resolution. <br /> REASONS: <br /> Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to <br /> Florida Engineering and Development Corporation to provide <br /> professional construction services for the construction of the 174th <br /> Street Roadway Improvement project. The general scope of services <br /> included drainage enhancements, complete sidewalk and roadway <br /> reconstruction from North Bay Road east, to Collins. Improvements <br /> west of North Bay Road were limited to milling and resurfacing the <br /> existing pavement surface, and minimal sidewalk repair. New <br /> landscaping and irrigation will be installed along the full length of 174th <br /> street. <br /> Through Change Order No. 3 the scope of work has been revised to <br /> include the installation of new water service lines to some of the <br /> existing Winston Towers residences where the existing service lines <br /> have been identified as needing replacement. This work will be done <br /> in partnership with the City of North Miami Beach,who owns, operates <br /> and maintains the water services throughout the City of Sunny Isles <br /> Beach. <br /> The City of North Miami Beach agrees to reimburse the City Sunny <br /> Isles Beach for all contractor costs associated with the replacement of <br /> the existing water services, on a per service line basis, in the amount <br /> not to exceed 5158,494.41. <br /> ADDITIONAL INFORMATION: <br /> This resolution is a companion item to the resolution approving <br /> Change Order Nos. 2 and 3 for replacement of existing curb and <br /> sidewalk along 174th street west of North Bay Road (CO #2) and <br /> replacement of existing North Miami Beach water service lines within <br /> the project limits (CO#3). <br /> FUNDING SOURCE: <br /> Funding has been appropriated in account No 300-5-5410-465000- <br /> httpl/sunnyisles.novtsagenda.cam/agendaweb/CoverSheet.aspxRltemID=1757 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.