Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Civnrplere oro Sucr;on E Tor emir Key persGrr.) <br />12. NAME <br />,enniier HOUera <br />15. FIRMI IVARIt AICD COCA i 10M rCa, a..d State) <br />Curtis + Rove.. Design Studio, Inc. Miami Florida <br />16. EDUCATION rDEGREE AND SPECIALIZATION) <br />FIU — masters of Landscape Architecture <br />13. ROLE IN THIS CONTRACT <br />EanaaCapa Arcn;tet t <br />a. TOTAL b WITH CURRENT FIRM <br />8 1 3 <br />17 CURRENT PROFESSIONAL REGISTRATION TSTATE AND DISCIPLINE) <br />Landscape Architect: Florida L.A-bd6Tuy3 <br />Ts.OiritRPROFEsSIOAAEOUACIFICATIOASrt-ubr:caVo.,s,O,r.a:.,.,.y,A as, tom) <br />Affiliations: Member of The American Society of Landscape Architects <br />19. RELEVANT PROJECTS <br />5 1 AAoARD FORM J30 (11,04) i-AtjE 2 <br />(1) TITLE AND LOCATION (Giy and Srate) <br />(2I YEAR COMPLETED <br />Browaraa Coi itflunue <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (I/applicable) <br />Ft. Lauderdale Florida <br />2010 <br />2013 <br />(3) BRIEF DESCRIPTION (Brie/scope, size, cost etc) AND SPEC+FIC ROLE ® Check If project performed w th rugent firth <br />Curtis + Rogers was a part of the Master Plan process for the Broward Courthouse Complex. Currently under design is Phase 1 of that Master Rai. <br />which involves a new Courthouse Building and Plaza fronting SE 6th Street in Downtown Ft. Lauderdale. The Plaza has been designed to function <br />a <br />as a pu5lic Space Tor large and orriall civic gatrieringo, and IRS grapy tnat typically gatRer in Trnt UT tniz, Inatitation, including vendors and tda—dlies <br />with children. Shade is provided by a grove of royal palms on the west side of the walkway that open up and climb the double set of stairs to the <br />Courthouse Plaza. There is a small simple structural space for children to play in and shaded seating for parents. The plaza includes a smaller <br />scale, sllaned space in provide reroge TIDm IRS activity In Trona OT aRe c'vufif ouuse wMicR also prviaea Pfantlicap access to tele 6ailding. I Rio space <br />is focused on a shaded inclined path that wraps around canopy trees as it climbs to the entry plaza, creating an intermediary platform halfway up for <br />seating and gathering for individuals or a small group. Cost: X225 million <br />(q 111 reAmnmirAilon rtiyanRsrare/ <br />(q rERR COMFEEiE13 <br />City of Curai GaBlea i ieu Saueeauion Plan <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ilapplicable) <br />Coral Gables, Florida <br />2012 <br />2016 <br />(3) BRIEF DESCRIPTION (Brierscope, size, cost etc) AND SPECIFIC ROLE ® Check if project purl'thmed w;trl co cnt firth <br />CaMo T Rogers was Hired By tfie City UT Coral GdBlea to develop a I rea Sacceaoiotr aira Initiation Han tut the trees in single family residential <br />b, <br />areas. The Curds;F Rogers team provided an evaluation of existing street trees, from a visual/horticultural conditions. The trees where mapped, <br />identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree replacements. Over <br />38,300 trees were evaluated. Collis + Rogers attended Cor�rmanity meetinga to SeeR input and prreaent preliminary nndinga. ultimately IRS team <br />created maps for street planting themes, and listed the trees needing immediate replacement, identified locations for new trees and recommended <br />others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled the City to develop a program for systematic <br />replacement of trees to ensure the longevity ore the canopy — wRicn cnaracterizes the Giry 6eamirul. Gost:$z,00,000 -$3,0uu.000 Tar initial <br />implementation <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Coconut Grove Streetscape Improvements <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Il applicable) <br />Miami, Florida <br />2013 <br />za14 <br />4. <br />(al BRIEF DEaCRIP i IDA rantr scope, size cost, erc.) AAD SI`Kl c; MODE ® Check ff project performed with current firm <br />The goal of the project was to review the existing problems with brick lifting and root intrusions in the sidewalks and evaluate existing tree <br />cunditiona, wniie maintaining IRS aAioting wondeffial character cT coconut Grove. A,,0m6i5ati0rr at sarationa nave Been proposed and include new <br />trees planted in conditions optimal for future growth, maintaining existing trees while improving their immediate growing environment and <br />replacement of bricks set in a more suitable base material. Cost $6,000,000 Phase I <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Pine Jog Elementary 1 FAU Nature Center Facility <br />PROI-E5510MADStRVICEa <br />C0M5rR0rd0M jnapptk..o1.1 <br />Naim Beack Florida <br />2006 <br />2008 <br />(al nRItF OEbrRiP i IUM rnderscope, size cost, ere.) AICD SPECIFrC RODE ® Check if project performed with current firm <br />d• <br />Located in an ecologically sensitive pineland area as well as being the first LEED project for the Palm Beach School District, Pine Jog Elementary <br />hoed the context ut its ourrounainub and tRe o5jectivea of IRS FAU Mature Ce, iter Facility to create an crwirnm errtaily sensitive educational program <br />to teach children as well as the school staff and the general public about the benefits of sustainable building. The landscape uses 100% native <br />plants which are ecologically appropriate to a pineland habitat in this area of Florida and has significantly reduced the amount of potable water used <br />Tor ;rri atium CCU at: 3U.lNl1:U611 <br />e. <br />(r) i I r DE AAD DOCA i 100 (Cry and stare) (z) TEAR kXMI'LE i ED <br />5 1 AAoARD FORM J30 (11,04) i-AtjE 2 <br />