My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis & Rogers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Curtis & Rogers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:46:27 AM
Creation date
7/18/2016 11:40:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I% EAAMPLE PROJEC I S wRILR BES I IELuS I KA I E PRuPuSED I tAM'S <br />41uALIt-IGA I IONS FUR I RIS GUN I KAU I <br />(Present as many Projects as reyuestea by the ayernCy, Di 10 prOjeCts, it riot Specified. <br />Complete one Section F for each oroiect.) <br />21. TITLE AND LOCATION (City and State) <br />Coconut Grove 5treetscapes Improvements <br />Coconut Grove, Florida <br />Z =AAmPEt PROJECT KEY <br />AORGIBER <br />10 <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION(Ifa,.,,licable) <br />September 2010 -2014 1 2015 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b POINT OF CONTACT NAME c POINT OF CONTACT TELEPHONE NUMBER <br />City of Miami <br />Capital Improvements Program Hector Badia; Project Manager 305-416-1236 <br />444 S.W. 2nd Avenue, 8th Floor <br />Miamil, Fla, 113a 33730 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The City of Miami; hired Curtis T Rogers to provide design services <br />related to atreetaCaNa renovations ;n trie t;oconut Grove Central <br />Business District. The goal of the project was to review Me existi..y <br />problems with brick lifting and root intrusions in the sidewalks and <br />evaluate existing tree conditions, while maintaining the existing <br />wandurfal criaracter UT Coconot drove. A comDination at solutions <br />Rave Deen proposeti anO include ..vv„ treau piarite0 in conditiona <br />optimal for future growth, maintaining existing trees while improving <br />their immediate growing environment and replacement of bricks set in <br />a more aa;tal5le 15aa8 mate. ial. <br />The Curtis * Rogers team included landscape arcriitects, urban <br />arborists and horticulturists all working together to develop creative <br />solutions to the challenging conditions. Extensive meetings were held <br />witn members at tris Coconut Grove 6asi..es5 District. 6uai�.eaaGa .n <br />Me area and Me general public to seen inpat and i'aeas Tor Me project. <br />Cost: $ 6,000,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME I (2) FIRM LOCATION (City and State) I (3) ROLE <br />a• <br />Curti* + RaElars ul lgn 5taaw, 1111larni, Flaniaa LantloCape AraRiteCt <br />Inc. <br />5 1 ANDAKu FURIvi 330 (1±2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.