My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1550
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 1:59:38 PM
Creation date
6/24/2010 10:51:43 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1550
Date (mm/dd/yyyy)
04/15/2010
Description
5th Amend to Agmt w/Beiswenger, Hoch & Assoc. Design Drainage System N. Bay Rd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2010 - JSSO <br /> <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF <br />SUNNY ISLES BEACH, FLORIDA, APPROVING THE FIFTH <br />AMENDMENT TO CONSULTANT AGREEMENT WITH <br />BEISWENGER, HOCH AND ASSOCIATES, INC. (BH&A), TO <br />PROVIDE ADDITIONAL ENGINEERING DESIGN SERVICES TO <br />INCLUDE NORTH BAY ROAD FOR THE CONSTRUCTION OF <br />THE CENTRAL ISLAND DRAINAGE PROJECT, IN AN <br />AMOUNT NOT TO EXCEED TWENTY-TWO THOUSAND <br />THREE HUNDRED EIGHTY DOLLARS ($22,380.00), ATTACHED <br />HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO <br />EXECUTE SAID FIFTH AMENDMENT TO AGREEMENT; <br />AUTHORIZING THE CITY MANAGER TO DO ALL THINGS <br />NECESSARY TO EFFECTUATE THE TERMS OF THE <br />AGREEMENT; PROVIDING FOR AN EFFECTIVE DATE. <br /> <br />WHEREAS, the City has continuously experienced problems with flooding in the <br />Central Island area, and was in need of engineering services for drainage improvements in the <br />Central Island area; and <br /> <br />WHEREAS, on December 18, 2003 the City Commission, via Resolution No. 2003-628, <br />approved an agreement with Beiswenger, Hoch & Associates for Stormwater System Design, <br />Technical Assistance and Bidding Process for Central Island Stormwater Drainage for a total fee <br />of One Hundred Sixty-Seven Thousand Forty Dollars ($167,040.00); and <br /> <br />WHEREAS, pursuant to Resolution No. 2006-1025, adopted on December 14,2006, the <br />City Commission approved the First Amendment to the Agreement to provide necessary updates <br />to the existing plans and technical assistance required to incorporate the undergrounding utilities <br />information for the Central Island Drainage Project, for a total fee of Twenty-Four Thousand Ten <br />Dollars ($24,010.00); and <br /> <br />WHEREAS, pursuant to Resolution No. 2008-1202, adopted on January 17, 2008, the <br />City Commission approved the Second Amendment to the Agreement to provide additional <br />design services to incorporate curbs and gutters to all of the streets for the Central Island <br />Drainage Project, for a total fee of One Hundred Sixteen Thousand Eight Hundred Forty Dollars <br />($116,840.00); and <br /> <br />WHEREAS, pursuant to Resolution No. 2008-1220, adopted on February 21, 2008, the <br />City Commission approved the Third Amendment to the Agreement to provide project <br />management, engineering testing, and quality control services for the construction of this project, <br />for a total fee of Two Hundred Seventy-Eight Thousand Three Hundred Fifty-Five Dollars <br />($278,355.00); and <br />
The URL can be used to link to this page
Your browser does not support the video tag.