Laserfiche WebLink
METROPOLITAN DADE COUNTY, FLORIDA <br /> METRODADE EMI <br /> ENVIRONMENTAL RESOURCES MANAGEMENT <br /> OFFICE OF THE DIRECTOR <br /> 33 S.W.2nd AVENUE <br /> MIAMI, FLORIDA 33130-1540 <br /> (305)372-6754 <br /> FAX(305)372-6759 <br /> 24-AUG-1998 <br /> MR. JORGE VERA, DIR. ZONING DIV. <br /> 17070 COLLINS AVE. , #250 <br /> SUNNY ISLES, FL. 33160 <br /> Re: Zoning Hearing # S98000013 ;FIVE SEAS INVESTORS <br /> Dear Mr. Vera: <br /> DERM has reviewed the subject application and has determined that it <br /> meets the minimum requirements of Chapter 24 of the Code of <br /> Miami-Dade County, Florida . Accordingly, the application may be <br /> scheduled for public hearing. DERM has also evaluated the request <br /> insofar as the general environmental impact that may derive from it, <br /> and based upon the available information offers no objection to its <br /> approval . <br /> POTABLE WATER SUPPLY & WASTEWATER DISPOSAL <br /> Public water and public sanitary sewers can be made available to this <br /> property. Therefore, DERM will require connection to the public <br /> water supply and public sewer systems . <br /> Notwithstanding the foregoing, in light of the fact that the County' s <br /> sanitary sewer system has limited sewer collection/ transmission and <br /> treatment capacity, no new sewer service connections can be permitted <br /> until adequate capacity becomes available. Consequently, final <br /> development orders for this site may not be granted unless adequate <br /> capacity in the sanitary sewer collection/transmission and treatment <br /> system is available at the point in time when the project will be <br /> contributing sewage to the system or if approval for alternative <br /> means of sewage disposal can be obtained. Use of an alternative <br /> means of sewage disposal shall be an interim measure, with connection <br /> to the public sanitary sewer system required upon availability of <br /> adequate collection/transmission and treatment capacity. <br /> STORMWATER MANAGEMENT <br /> A Standard General Environmental Resource Permit from DERM shall be <br /> required for the construction and operation of the required surface <br /> water management system. The applicant is advised to contact DERM in <br /> order to obtain additional information concerning these requirements . <br /> All stormwater shall be retained on site utilizing properly designed <br /> seepage or infiltration drainage structures . Drainage plans shall <br /> provide for full on-site retention of the stormwater runoff of a 5 <br /> year storm event . Pollution Control devices shall be required at all <br />