Laserfiche WebLink
<br />RESOLUTION NO. 05-Z- <1'5 <br /> <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF <br />SUNNY ISLES BEACH, FLORIDA, ("CITY") APPROVING THE <br />ZONING APPLICATION SUBMITTED BY ST. TROPEZ II, LLC <br />(THE "APPLICANT"), (Z200S-04) FOR A MODIFICATION OF <br />PREVIOUSL Y APPROVED PLANS AND A VARIANCE OF <br />SETBACK, ON THE PROPERTY LOCATED AT 150-260 SUNNY <br />ISLES BOULEVARD, SUBJECT TO CERTAIN CONDITIONS; <br />AND PROVIDING FOR AN EFFECTIVE DATE. <br /> <br />I. RECITALS. <br /> <br />WHEREAS, on August 1, 2005, St. Tropez II, LLC (the "Applicant") submitted an <br />application (the "Application") No. Z2005-04 to the City of Sunny Isles Beach, Florida, <br />requesting the following: <br /> <br />1. Modification of plans approved under Condition #3 of Resolution 05-Z-91 passed and <br />adopted by the City Commission on March 22nd, 2005 reading as follows: <br /> <br />From: Plans are on file and may be examined in the Zoning Department entitled "St Tropez on <br />the Bay", prepared by Kobi Karp Architecture & Interior Design, consisting of 17 sheets <br />dated received 1-26-05 and plans entitled "Boundary Survey, Paving and Drainage <br />Plans", prepared by Fortin, Leavy, Skiles, Inc., consisting of 4 sheets dated stamped <br />received 1-26-05 and plans entitled "St Tropez on the Bay", prepared by Marlin <br />Engineering dated 0 1-21-05 and plans entitled "Lighting and Landscape", prepared by <br />EGS2 Corp dated stamped received 1-26-05. Plans may be modified at public hearing. <br /> <br />To: That the project shall be developed substantially in accordance with the plan submitted for <br />public hearing for "St Tropez II, LLC" and are on file with the City Zoning Department <br />entitled "St Tropez on the Bay", prepared by prepared by Kobi Karp Architecture & <br />Interior Design, consisting of 17 sheets dated received 8-01-05 and plans entitled <br />"Boundary Survey", prepared by Fortin, Leavy, Skiles, Inc., dated stamped received 8-01- <br />05 and plans entitled "Paving and Drainage, Water and Sewer plans and details", <br />consisting of 5 sheets prepared by Marlin Engineering dated 8-01-05 plans entitled "Sign <br />and Paving Markings", consisting of 4 sheets prepared by Marlin Engineering dated <br />revised 8-04-05 and plans entitled "Lighting and Landscape", consisting of 4 sheets, <br />prepared by EGS2 Corp dated 8-01-05. Plans may be modified at public hearing. All <br />conditions approved under Resolution 05-Z-91 shall remain in affect. <br /> <br />The purpose of this request is to modify the previously approve plans to comply with the <br />requirements of the Department of Environmental Resources and Management (DERM) <br />regarding the bulkhead along the rear of the property. <br /> <br />2. Variance of Section 265-37 requiring the towers above the garage pedestal to setback zero <br /> <br />St. Tropez 9/27/05 1 Verified bY:~ <br />