My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 99-123
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
1999
>
Reso 99-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:06:34 PM
Creation date
1/25/2006 1:56:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
99-123
Date (mm/dd/yyyy)
02/11/1999
Description
Grant: Fla Inland Navigation District for a Police/Marine Vessel, $80,000.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />::r ,l.J. t <br /> <br />(b) Project costs ineligible for program funding or matching funds will include: <br />contingencies, miscellaneous, reoccurring personnel related costs, land acquisition <br />and any extraneous recreational amenities not directly related to the waterway <br />such as the following: <br />1. Landscaping <br />2. Park and playground equipment <br />3. Restrooms for non-waterway users <br />4. Tennis courts <br />S. Roadways providing access to non-waterway users <br />6. Parking areas for non-waterway users <br />7. Utilities for non-waterway related facilities <br />8. Lighting for non-waterway related facilities <br />9. Irrigation equipment <br />10. Maintenance equipment <br />II. Picnic shelters and furniture. <br />12. Vehicles to transport vessels. <br />(c) Subject to approval by the Board of an itemized expense list: <br />1. The following project costs will eligible for program funding or as matching <br />funding: <br />a. Project management, administration and inspection; <br />b. Design, permitting, planning, engineering or surveying costs for completed <br />construction project; <br />c. Restoration of sites disturbed during the construction of an approved project; <br />d. Equipment costs. <br />2. The following project costs will be eligible only as matching costs and can not <br />exceed fifteen (15) percent of the applicants match: <br />a. Applicant's non-recurring personnel costs; <br />b. Applicant's equipment costs; <br />c. Applicant's in-house project management administration and inspection costs; <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.