My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2000-195
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2000
>
Reso 2000-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2013 11:25:11 AM
Creation date
1/25/2006 1:56:30 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2000-195
Date (mm/dd/yyyy)
02/10/2000
Description
Wildcat Demolition Demolish Bldg at New City Hall Site.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />DEl\tlOLITION/SAL V AGE CONTRACT <br /> <br />THIS AGREEMENT dated this ~ day of F.p b rVa.f'Y , 2000, <br />is made by and between WILDCAT, with a business address of P.O. Box 2506, Ft. <br />Lauderdale, Florida 33303, (the "Contractor") and the CITY OF SUNNY ISLES <br />BEACH, of 17070 Collins Avenue, Suite 250, Sunny Isles Beach, Florida 33160, (the <br />"City"). <br /> <br />RECIT ALS <br /> <br />WHEREAS, the City of Sunny Isles Beach wishes to demolish the structure <br />upon the site on which it intends the City Hall; and <br /> <br />WHEREAS, Wildcat agrees to perform such demolition functions based on <br />the terms and conditions set forth hereinbelow; <br /> <br />NOW THEREFORE, in consideration of the mutual covenants set forth <br />herein, the parties agree as follows: <br /> <br />1. THE WORK. <br /> <br />A. Wildcat agrees to perform the following described demolition work at <br />393-401 Sunny Isles Boulevard, (hereinafter described as "the Work"): <br /> <br />(i) Totally demolish and remove building and tower, including slab <br />on grade and foundations; remove associated sidewalks and <br />curtain walls; <br /> <br />(ii) Rough grade site to distribute piles of dirt. <br /> <br />(iii) Remove asphalt paving on site. <br /> <br />(iv) Remove piles of shrubs, concrete and asphalt. <br /> <br />(v) Wildcat shall be responsible for all utility disconnections and/or <br />identifications prior to the start of demolition, including sewer <br />cap and/or septic tank purging. <br /> <br />B. Any alteration or deviation from the specified work involving extra cost of <br />equipment, labor or materials will become an extra charge over the contract sum as set <br />forth in Paragraph 3 below. <br /> <br />C. Should unknown physical conditions be found to exist which are either a) <br />different from conditions ordinarily encountered, or b) different from conditions <br /> <br />Demolition Contract! Attomey3/Ocncral <br />. 2I2JOO - 8:55 AM <br />LMD:ch <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.