<br />.. \ .,},
<br />
<br />EXHIBIT "1"
<br />
<br />RETURN TO: Miami-Dade County
<br />Department of Environmental Resources Management
<br />33 SW 2nd Avenue, Suite 300
<br />Miami, Florida 33130
<br />A TTN: Brian Flynn
<br />
<br />Temporary Easement and Agreement for Beach Renourishment
<br />
<br />'\~
<br />THIS TEMPORARY EASEMENT AND AGREEMENT, made this the \
<br />day of ~ ' L.-COO , between ~"'~ ~~ -:r,,\.g1 ~~
<br />(hereinafter "G NTOR"), and Miami-Dade County (hereinafter "GRANTEE").
<br />
<br />WITNESSETH:
<br />
<br />WHEREAS, the real property described in Exhibit "A", attached hereto and made
<br />a part hereof (hereinafter the "Beach Front") is owned in fee simple by GRANTOR; and
<br />
<br />WHEREAS, GRANTEE desires to implement the Sunny Isles Design
<br />Modification Project (hereinafter the "PROJECT"), to renourish and improve the
<br />BEACH FRONT to provide maximum use, benefit, and protection;
<br />
<br />THEREFORE, in consideration of the mutual covenants hereinafter stated, and
<br />ten dollars ($10 US) in hand paid, receipt of which is hereby acknowledged by
<br />GRANTOR, and the benefits to the GRANTOR which will result from the PROJECT,
<br />GRANTOR does hereby grant, bargain, sell and convey unto the GRAN1EE, its officers,
<br />employees, agents, servants, contractors and subcontractors, the temporary and
<br />assignable right and easement to:
<br />
<br />1) Construct, operate, maintain, repair, replace, and remove pipelines and other
<br />necessary equipment utilized in connection with the transmission of material
<br />for beach renourishment, upon, to, or across the BEACH FRONT;
<br />2) Deposit excavated sand, fill, spoil, and waste materials upon the BEACH
<br />FRONT;
<br />3) Excavate ditches and construct dikes, mounds, and control works upon the
<br />BEACH FRONT, to prevent flooding of areas adjacent to the BEACH
<br />FRONT;
<br />4) Move, store, and remove equipment and supplies, and erect and remove
<br />temporary structures on the BEACH FRONT;
<br />5) Perform work necessary and incident to the construction of the PROJECT,
<br />including the right to trim, cut, fell, and remove all trees, underbrush,
<br />obstructions, and any other vegetation, structures, or obstacles within the
<br />limits of the right of way.
<br />6) Alter, grade, and till the BEACH FRONT for the purpose of beach
<br />renourishment.
<br />
|