My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2000-254
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2000
>
Reso 2000-254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2013 3:34:54 PM
Creation date
1/25/2006 1:56:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2000-254
Date (mm/dd/yyyy)
07/20/2000
Description
Albert R. Perez., Conceptual Plan for City Park at N. Bay Rd & 181st St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1216/1215/121121 1219: 17 <br /> <br />Z 31215 445 6131 <br /> <br />R.R.PEREZ RSSOC. <br /> <br />p.a3 <br /> <br />Mr. Edward M. Smith <br />Re: 181 Dr & N Bay Rd Park <br />5 June, 2000 <br />Page 2 <br /> <br />Survey work and testing required by the project is not Included above. These costs are <br />projected to be approximately $8.000 to $10,000. <br /> <br />Projected Work Schedule <br /> <br />Schematic Phase <br />Clty's Review/Comments <br />ConstructIon Documents <br />Clty's Review and Comments at 50% & 90% CD <br />Permits <br />Advertisement and Bidding Period <br />Bid Award <br /> <br />3 weeks <br />1 week <br />12 weeks <br />2 weeks <br />4 weeks <br />5 weeks <br />1 weeks <br />28 weeks <br /> <br />Construction Phase <br /> <br />50 weeks <br /> <br />Total Projected <br /> <br />78 weeks <br /> <br />Scope of Service. <br /> <br />Schematic Phase <br /> <br />Commission additional survey work and testing required by the Project. <br />Interface with all governing agencies to ensure compliance. <br />Refine and further develop the programmatic requirements approved during the <br />Conceptual Master Plan Phase. <br />Submit statement of probable costs, colored site plan, architectural plans and <br />elevations and outline specifications. <br />Submit 4 copies of all the above documentation in black and white for review by the <br />City. <br /> <br />Construction documents Phase. <br /> <br />Plans. speclncatlons and statement of probable costs as required by the project. <br />Submission of above at 50% for review by the City. <br />Submission of the above at 90% for review and comments by the City. <br />Submission of 100% Construction Documents. <br />Submission of 4 sets of documents at each submittal. <br /> <br />Permitting Process <br />Bidding Phase. <br /> <br />Advertise for bidding. <br />Answer RFI and Issue addenda if required. <br />Review bids and recommend successful bidder. <br /> <br />Bid Award <br />
The URL can be used to link to this page
Your browser does not support the video tag.