Laserfiche WebLink
<br />Finally, WSM is a surveying and mapping firm exclusively. We employ over 60 surveyors. <br />The Miami office staff numbers 20, including 3 professionals and 4 field survey parties - a size that <br />should inspire confidence that we can pI'9vide the necessary services within a reasonable schedule. <br /> <br />WSM is proposing to provide a design survey. This survey will delimit the right of way of <br />Collins Avenue to mapping accuracy only. We are not proposing a boundary survey. Ifthis is not <br />sufficient to your intentions ( if the city is anticipating the purchase of right of way, for example) <br />please advise so we may consult with you further. The scope of services for the design survey is <br />proposed as follows: <br /> <br />1 ) Primary Control- Establish horizontal and vertical control. Horizontal datum will be the <br />Florida State Plane Coordinate System, East Zone, NAD 83/90 (we already have this datum <br />established for the previous mapping) and vertical datum will be the National Geodetic <br />Vertical Datum of 1929. Control stations will be set at approximately 660 feet interval in <br />locations chosen for safety. About 21 stations will be necessary. The stations will be <br />referenced for future recovery. This survey will include both conventional and GPS <br />techniques. <br /> <br />2) Establishment of Baseline - Utilizing the best available evidence, depict the FDOT <br />survey baseline and right of way lines from record documents. The actual survey baseline <br />will not be staked in the field but will be referenced to the primary control by coordinate <br />values. <br /> <br />3) Topography - Utilizing electronic total stations and Electronic Field Book (EFB) data <br />collectors, map all surface features. The mapping will be provided in plan and in the form <br />of a Digital Terrain Model (DTM), both delivered electronically. <br /> <br />4) Utilities - All surface (visable) evidence of utilities will be located. WSM will request a <br />"mark out" but this is not always provided. If marked, we will locate the marks and connect <br />same. Regardless, WSM is not responsible for utilities we can not see. All utilities may not <br />be shown. We strongly suggest that the engineer take responsibility for this phase of the <br />work and satisfy themselves as to all utility matters. Additionally, OSHA prohibits our entry <br />into "confined spaces" such as manholes and inlets, thus our measurements at these locations <br />must be made from the outside and may not be to normal surveying tolerances. <br /> <br />WSM has attached a full estimate of surveying services for the project proposed above. The <br />total fee of $55,864.00 represents a lump sum. We are willing to discuss alternate forms of <br />contracting. <br /> <br />Weidener Surveying & Mapping P.A. <br />