My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-442
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2013 10:10:36 AM
Creation date
1/25/2006 1:57:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-442
Date (mm/dd/yyyy)
05/14/2002
Description
– Bid #02-03-01, Vila & Son Landscaping for Landscp Impr. Collins Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />subgrade shall be established as herein specified. Depths are relative to the elevation of the top of curb. <br /> <br />3.04 SHIPMENT AND DELIVERY <br /> <br />A Notify the CONSULTANT a minimum of2 (two) working days in advance of when plant material is <br />to be delivered. <br /> <br />B. Plant material shaH be protected from weather, adequately packed to prevent breakage and drying out <br />during transit. The use of anti-transparent, in compliance with the manufacturers specification, is <br />encouraged. <br /> <br />C. Plants shall not be planted on job until they have been inspected at receiving site and accepted by <br />CONSULTANT. <br /> <br />D. Plants which show improper handling, bruised trunks, broken branches or root balls or arrive on site <br />in an unsatisfactory condition will be rejected. <br /> <br />E. Acceptance of plant material will be given by the CONSULTANT only after the material is planted and <br />after meeting all of the incidental requirements prescribed herein and on the plans. <br /> <br />3.05 PLANTING TREES <br /> <br />A General <br /> <br />1. Locate and mark proposed positions of all plants or plant beds with stakes. Before digging, <br />notify CONSULTANT for review and acceptance or possible relocation. <br /> <br />2. If location indicated on planting drawings cannot be used, other locations shall be chosen, <br />subject to approval by CONSULTANT. <br /> <br />3. Coordinate with site lighting, irrigation, paving, piping, electrical and other related site work. <br /> <br />B. Excavation: <br /> <br />1. Excavations identified as having potential utility or service line conflicts shall be excavated by <br />hand tools to determine the location of any utilities that may otherwise be damaged by <br />excavation. <br /> <br />2. Excavate tree and palm pits as necessary to accommodate root balls of material when plant <br />is set to finished grade, with a minimum six inches of "planting soil" under the spread of <br />bottom-most roots. Diameter of pits for trees shall be as shown on the drawings. <br /> <br />3. Barricade or mark excavations to prevent danger to cars and pedestrians. <br /> <br />C. Planting: <br /> <br />1. Set trees in vertical position such that finish grade at the trunk shall be the same as in previous <br />container or field growth. <br /> <br />02900-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.