Laserfiche WebLink
<br />2. Low Moisture Content: <br />Should moisture content not reach established minimum moisture content, CONTRACTOR shall <br />disk, sprinkler, water, mix, and/or otherwise bring the moisture content to within uniform minimum <br />allowable limits. <br /> <br />3.03 COMPACTION <br />CONTRACTOR shall compact and / or otherwise manipulate each layer offill using a vibratory <br />compactor such that a uniform compaction of not less than 98% of maximum dry density, per <br />AASHTO T-180 (Modified Proctor). <br /> <br />Where compaction fails to meet specified limits, CONTRACTOR shall rework, re-compact, and retest <br />failed areas. <br /> <br />3.04 FIELD QUALITY CONTROL <br />Provide passing density / moisture tests in accordance with Section 01452, testing schedule. <br /> <br />END OF SECTION <br /> <br />02725 - 2 <br />