My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-442
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2013 10:10:36 AM
Creation date
1/25/2006 1:57:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-442
Date (mm/dd/yyyy)
05/14/2002
Description
– Bid #02-03-01, Vila & Son Landscaping for Landscp Impr. Collins Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(ten) days prior to Bid due date.. <br /> <br />2. The CONTRACTOR shall demonstrate complete conformance with requirements of this <br />section in submitting price list. <br /> <br />3. This provision of unit prices shall in no ways be construed as permitting substitution for <br />specific items described on the drawings or these specifications unless substitution has been <br />accepted in writing and in advance by the CONSULTANT. <br /> <br />B. Material Review and Certification: <br /> <br />1. The CONSULTANT shall review all materials identified as "matched", "tree form" or <br />"specimen", or as defined in these specifications, at the nursery source to verify species, vigor, <br />size, condition, shape, quantity, for compliance with specification and drawings. Request for <br />nursery review shall be received at least five days prior to the desired review date. <br />CONTRACTOR shall tag all trees and palms before inspection. <br /> <br />2. Photographs or representative, individual samples to the satisfaction of the CONSULTANT, <br />shall be submitted for review and acceptance of all other plant materials. Samples of plants <br />shall be submitted to the CONSULTANT for review as indicated on the plans, or as requested <br />by CONSULTANT. <br /> <br />3. Inspection certificates shall accompany the invoice of each shipment or order of stock, as may <br />be required by law for transportation. Upon completion of installation deliver all certificates <br />to CONSULTANT. <br /> <br />4. Submit one quart sample of specified mulch and planting soil for review and acceptance by <br />CONSULTANT. <br /> <br />1.05 MATERIAL HANDLING <br /> <br />A. Delivery and Storage <br /> <br />1. Deliver all items to the site with all labels intact and legible at time of CONSULTANT'S <br />inspection. <br /> <br />2. Immediately remove from the site all materials which do not comply with the provisions of <br />this section of these specifications. <br /> <br />3. Use all means necessary to protect materials before, during and after installation and to <br />protect installed Work and materials of all other trades. <br /> <br />B. Replacements: In the event of damage or rejection, immediately make all repairs and replacements <br />necessary to the acceptance of CONSULTANT at no additional cost to CITY. <br /> <br />PART Z - PRODUcrS <br /> <br />2.01 MISCELLANEOUS MATERIALS <br /> <br />A. Planting Soil: For plants and trees, use a weed and rock free mixture of 60 (sixty) percent fresh water <br />sand (medium to coarse grade) and 40 (forty) percent Florida Horticultural Grade Peat thoroughly <br />mixed with a commercial shredderlblender or equivalent. <br /> <br />02900-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.