Laserfiche WebLink
<br />. <br /> <br />MANLOADING <br />Golden Shores Drainage and Street Improvements <br />September 2002 through November 2002 <br /> <br />End of Contruction <br />End of CEI Contract <br /> <br />Mid-November 2002 <br />November 30, 2002 <br /> <br /> TOTAL TOTAL <br /> MAN MAN <br />PERSONNEL 2002 MONTHS HOURS <br />CLASSIFJCA TIONS Sept Oct Nov (173 hrs./mo) <br />Project Manager (Office) 0.4 0.4 0.4 1.2 208 <br />Resident Engineer 0.1 0.1 17 <br />Project Engineer (Field) 0.1 0.1 0.2 34 <br />Senior Inspector 1.0 1.0 1.0 3.0 519 <br />Inspector (Asphalt/Roadway) 0.3 0.1 0.4 69 <br />TOTALS 1.5 1.7 1.7 4.9 847 <br /> <br />FEE ESTIMATE <br />Golden Shores Drainage and Street Improvements <br />September 2002 through November 2002 <br /> <br />Classification Hours Rate <br />Project Manager (Office) 208 $140 <br />Resident Engineer 17 $110 <br />Project Engineer (Field) 34 $83 <br />Senior Inspector 519 $62 <br />Inspector (Asphalt/Roadway) 69 $49 <br /> <br />Fee <br /> <br />Subtotal 847 <br />Field Survey (reimbursable amount) ($2,000/month) <br />Subconsultant - Geotechnical, Quality Control <br />Total Fee Estimate <br /> <br />$29,120 <br />$1,870 <br />$2,822 <br />$32,178 <br />$3,381 <br /> <br />$69,371 <br />$6,000 <br />$5,000 <br />$80.371 <br /> <br />j:\work\projecls.opn\goldenshores.220\Manload-feeest.xls <br />