Laserfiche WebLink
<br />Mr. George Fisher <br /> <br />Page 2 <br /> <br />June 5, 2003 <br /> <br />3. service to proposed irrigation controllers. Our design shall be coordinated with O'Leary <br />Design and Associates. <br /> <br />4. Preparation of opinions of probable costs for all Electrical items outlined above. Opinions <br />of probable costs shall be submitted at the 90% and 100% levels. <br /> <br />5. Preparation of technical specifications in conformance with the standard master <br />construction specifications. Submittals shall include both hard and electronic copies of <br />the completed specifications at the 60%, 90% and 100% design levels. <br /> <br />6. Attend meetings to answer questions relevant to our design. <br /> <br />Task No.3 - Permitting and Bidding Services: <br /> <br />1. EDA shall make a representative available to assist the City during the permitting and <br />bidding service. <br /> <br />Our scope of services shall include the coordination and design of the proposed lighting <br />improvements as outlined above. Attached please fmd a breakdown of the anticipated man- <br />hours. The above work will be performed on a lump sum basis and will be billed at monthly <br />intervals. Our fee for this work shall be $59,260.00. Travel to and from the site and other <br />direct costs are included in the overhead rate and will not be billed as a separate line item. <br /> <br /> <br />ACCEPTED <br /> <br />~/~ <br /> <br />DATE J~ 17~ Eiw3 <br /> <br />Sffi-03-002D.doc <br />