My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-598
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 11:37:08 AM
Creation date
1/25/2006 1:57:25 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-598
Date (mm/dd/yyyy)
09/18/2003
Description
– Agmt w/Calvin, Giordano & Assoc., for Resident Only Parking.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No 16 <br />August 28, 2003 <br />Calvin, Giordano & Associates, Inc, Proposal No, 03-4415 <br /> <br />CITY OF SUNNY ISLES BEACH <br />Resident Onlv Parkin!! <br /> <br />PROJECT DESCRIPTION: <br /> <br />1. SCOPE OF SERVICES <br /> <br />I. Professional Land Surveying Services <br /> <br />A. Design Survey <br /> <br />Determine existing dimensions and elevations, and locate eXlstmg. site <br />boundary, parking lots, driveways, stmctures, fencing, trees and other physical <br />features as specified by the engineer. Prepare CADD base .file with all <br />information relevant to site engineering design. <br /> <br />II. Professiomd Civil Engineering Services <br /> <br />A. p..-e1iminary Investigation <br /> <br />Visit and inspect site to detennine existing conditions. Take photos,ma.lce <br />written documentation, sketches, notes and research ~,pecifk codc:s. regulations <br />and requirements. <br /> <br />B. Design Phase <br /> <br />Prepare proposed engi.ne~ring design for the "Resident Only" parking adjacent <br />to the City's Passive cmd Active Parkson North Bay Road while taking into <br />account location of. existing roadways, sidew.i.lks, property lines, trees, <br />structures. existing grades and dimensions. <br /> <br />C. Final Civil Engineering Services <br /> <br />Prepare construction drawings and specifications including paving, grading and <br />drainage plans in accordance with all applicable code:;. Secure all necessary <br />approvals for construction of project as required. Perform all work incidentals <br />to design of layout. Provide engineering drawings at time of technical <br />compliance. During bidding phases, any Requests for Information (RFI's) shall <br />be responded to, bids shall be opened, tabulated and recommendations shall be <br />made. <br /> <br />III. Construction Phase Services <br /> <br />A. Shop Drawing review and approval. <br />B. As-built Drawing review and approval. <br />C. final Certification and Closeout. <br />D. Pay Request review and approval. <br />E. Attend the pre-bid and monthly meetings. <br />F. Visit the site on regular basis to inspect constmction and assist the contractor <br />with any design related questions. <br /> <br />P:\Projects'2003\0344 15 Sunn)' Isles Rc~ident Only Parklllg\Sullny Islcs 'A'llr!,; AuthoriLatim - Resilient Only Parking.Joe <br />
The URL can be used to link to this page
Your browser does not support the video tag.