My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-606
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:07 AM
Creation date
1/25/2006 1:57:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-606
Date (mm/dd/yyyy)
10/23/2003
Description
– Amendment to Agmt w/Marlin Engineering, Inc., Reconstruct SIBlvd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit "A" <br /> <br />Subsurface Utility Exploration Estimate <br /> <br />Classicfication Hour Year 2003 Rates Total <br /> ., <br />QAlQC 0.25 $50.00 $12.50 <br />Proiect Manager 4.00 $42.76 $171.04 <br />Utility Locator Specialest 6.00 $25.45 $152.70 <br />CADD 2.50 $23.51 $58.78 <br />Utility Locator Assistant 13.00 $16.00 $208.00 <br />Clerical 2.00 $16.93 $33.86 <br /> Total Salary $636.88 <br /> <br />Overhead <br /> <br />161.25% <br /> <br />$1,026.96 <br />$1,663.84 <br /> <br />Subtotal <br /> <br />Operating Margin <br />FCCM <br /> <br />12.00% <br />0.098% <br /> <br />$199.66 <br />$0.62 <br /> <br />Daily Rate <br /> <br />$1,864.12 <br /> <br />Note:Daily rate is based on 6 holes per day <br /> <br />Description Quantity Rate Per Hole Total Cost <br />Utility WH (Loactes) 80.00 $310.69 $24,854.94 <br /> <br />Note: Total cost is base on an estimated number of holes contract shall be limiting <br />amount; cost may increase or decrease depending on actual field condition and <br />actual number of holes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.