My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-607
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 9:39:11 AM
Creation date
1/25/2006 1:57:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-607
Date (mm/dd/yyyy)
10/23/2003
Description
– FP&L Electric Substation.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . G-) 7 <br /> City Commission <br /> On" `steCityof SunnyIsles Beach David <br /> Samson,Mayor <br /> ff` 17070 Collins Avenue, Suite 250 NormanVice Mayor <br /> Gerry Goodman,C Commissioner <br /> Sunny Isles Beach,Florida 33160 Danny Iglesias,Commissioner <br /> • Lewis J.Tinier,Commissioner <br /> X305) 947-0606 City Hall <br /> to or ,,. X305) 949-3113 Fax Christopher J.Russo,Ciry Manager <br /> • r L ow, Lynn M.Dannheisser,CoAttorney <br /> 0„°� (305) 947-2150 Building Department <br /> OF SW Jane Hi nes, ;City Clerk <br /> X305) 949-5107 Fax <br /> MEMORANDUM <br /> To: The Honorable Mayor and City Commission ' <br /> Front Jorge L.Vera,Zoning and Planning Directo <br /> Date: October 9,2003 <br /> Re: Proposed Electric Substation <br /> RECOMMENDATION <br /> It is recommended that the City Commission adopt the attached Resolution accepting the design of <br /> the proposed electric substation. <br /> REASONS <br /> Florida Power and Light has purchased a property known as 393-401 Sunny Isles Blvd from the City <br /> with the intent to use the property for an electrical substation. The design treatment for the exterior <br /> facade of the electrical substation was top priority for the City, due to the property being located at <br /> the entrance to the City. As part of the sales Florida Power and Light is required to submit design <br /> of the substation for approval bythe City Commission. <br />
The URL can be used to link to this page
Your browser does not support the video tag.